Back to search

University of Illinois at Urbana-Champaign

Enhanced cost estimation for ABC bridge project: Data collection, analysis, and integration

Abstract

dc:description

The use of Accelerated Bridge Construction (ABC) methods such as prefabricated elements and lateral slides has been increasingly utilized by state departments of transportation (DOT) to reduce bridge construction time, minimize related traffic disruption, enhance safety, improve quality, and decrease environmental impact. To realize these reported ABC methods benefits, DOT planners need to accurately estimate and compare the cost of alternative bridge construction methods to ensure the selection of the most cost effective method. This presents DOT planners with a major challenge due to the lack of detailed bridge design information that is needed to accurately estimate the construction cost during the early design phase. To support DOT planners in this challenging task, the research objectives of this study focus on (1) conducting a comprehensive literature review on ABC methods, (2) collecting and analyzing a dataset of recently completed ABC projects, and (3) providing insights into the factors affecting cost estimation for ABC bridge projects through statistical and correlation analysis of the collected data. The main contributions of this research include the creation of an extensive dataset from 22 ABC bridge projects and identifying correlations between construction costs and various project variables. Statistical analysis revealed variability in project costs, while correlation analysis highlighted the impact of each factor. The findings of this study are expected to provide a better understanding of critical factors that affect bridge construction cost and enable the development of the predicted models that can be used to accurately estimate and compare the cost of alternative bridge construction methods during the early design phase.

Degree

thesis:*
Name thesis:degree_name
M.S.
Level thesis:degree_level
Thesis
Discipline thesis:degree_discipline
Civil Engineering
Grantor
University of Illinois at Urbana-Champaign
Year dc:date
2024

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Jeon, Hee Jae
Contributors dc:contributor
  • El-Rayes, Khaled A

Subjects

dc:subject × 2

Rights

dc:rights
Statement dc:rights
  • Copyright 2024 Hee Jae Jeon
Language dc:language
en, eng

Identifiers

dc:identifier.*
Handle dc:identifier
https://hdl.handle.net/2142/125622

Chain of custody

source
Harvested from
University of Illinois - Urbana-Champaign
Base URL
www.ideals.illinois.edu/oai-pmh
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Jeon, Hee Jae. Enhanced cost estimation for ABC bridge project: Data collection, analysis, and integration. Thesis thesis, University of Illinois at Urbana-Champaign, 2024. https://hdl.handle.net/2142/125622