Virginia Polytechnic Institute and State University
Effects of starting conditions and output data collection for simulation
Abstract
dc:description.abstractThis research examines the simulation issues of starting conditions and performance measure data collection. These issues are discussed in the context of a specific production system simulation model. The production system modeled was a modified flow shop at the International Business Machines Corporation, Federal Systems Division, (IBM/FSD), Manassas, Virginia, manufacturing facility. Where appropriate, generalizations for other production system simulation models are made with regard to the arguments and methods used in: 1) the choice of an acceptable type of starting condition procedure for the IBM/FSD production system model, 2) the methodology used to determine the specific starting conditions to impose on the model, 3) the development of a heuristic, based on performance measure dependency, to determine if the model's data collection procedure should include performance measure data collection on the entities' effects over the simulation analysis period (planning horizon) as well as at its end, and 4) the data collection synthesis technique chosen for the model to satisfy the heuristic's recommendations.
Degree
thesis:*- Name thesis:degree_name
- M.S.
- Level thesis:degree_level
- masters
- Discipline thesis:degree_discipline
- Industrial Engineering and Operations Research
- Department dc:contributor.department
- Industrial Engineering and Operations Research
- Grantor dc:publisher
- Virginia Polytechnic Institute and State University
- Year dc:date.issued
- 1983
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Abbott, Rebecca A.
Rights
dc:rights- Statement dc:rights
-
- In Copyright
- Licence dc:rights.uri
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/10919/114400
- OAI identifier oai:identifier
- oai:vtechworks.lib.vt.edu:10919/114400