University of Illinois at Urbana-Champaign
Mixed integer linear programming approach for solving assembly scheduling problems
Abstract
dc:descriptionIn this research, the problem of scheduling operations in manufacturing facilities with multiple machines that produce complex multi-level assemblies is considered. The problem is modeled with precedence relationships between operations. It has been formulated as a Mixed Integer Linear Program and is modeled as a flow-like problem. The objective of the problem is to reduce the total makespan (cumulative lead time) of production of final product. In addition to that, move sizes and batch sizes of operations are taken into consideration to see their impact on total makespan. Predetermined move size is used which facilitates batch overlapping, which in turn helps reduce the makespan. Column generation method has been used to solve the problem. Subproblem generates solution sets and the master problem selects from the set of generated solutions by the subproblem. Randomly generated problems with up to 100 assembly operations, 100 batch size, and 20 workcenters are used to test the formulations. Results show that makespan increases with increase in move size. This shows that batch overlapping increases the effectiveness of a schedule.
Degree
thesis:*- Name thesis:degree_name
- M.S.
- Level thesis:degree_level
- Thesis
- Discipline thesis:degree_discipline
- Industrial Engineering
- Grantor
- University of Illinois at Urbana-Champaign
- Year dc:date
- 2018
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Ganesan, Sharathram
- Contributors dc:contributor
-
- Nagi, Rakesh
Subjects
dc:subject × 4Rights
dc:rights- Statement dc:rights
-
- Copyright 2017 Sharathram Ganesan
- Language dc:language
- en
Identifiers
dc:identifier.*- Handle dc:identifier
- http://hdl.handle.net/2142/99279
- OAI identifier oai:identifier
- oai:www.ideals.illinois.edu:2142/99279