Back to results
University of Illinois - Urbana-Champaign
A study plan and an approximate estimate of the cost of a gravity yard
Abstract
dc:descriptionMade available in DSpace on 2017-11-30T22:46:24Z (GMT). No. of bitstreams: 2 5972785.pdf: 980986 bytes, checksum: e9a1b0eab0a0c1acd8671c21fba29153 (MD5) license.txt: 4813 bytes, checksum: 715c4321821a960fa1a1e91d2ac7ebce (MD5) Previous issue date: 1910
Degree
thesis:*- Name thesis:degree_name
- B.S. (bachelor's)
- Level thesis:degree_level
- Thesis
- Discipline thesis:degree_discipline
- Railway Civil Engineering
- Year dc:date
- 2017
Author and committee
dc:creator, dc:contributor.*- Authors dc:creator
-
- Rosecrans, Bennett Paine
- Zhen, Juedan T.
Subjects
dc:subject × 2Rights
dc:rights- Statement dc:rights
-
- Public domain
- Language dc:language
- en
Identifiers
dc:identifier.*- Identifier
-
5972785
ocn428151546 - OAI identifier oai:identifier
- oai:www.ideals.illinois.edu:2142/98837