Back to results
University of Illinois at Urbana-Champaign
Parallel Machine Scheduling in Manufacturing Systems: Impact of a Shared Resource and Multiple Stages
Abstract
dc:descriptionThe second problem requires jobs to be processed at two stages. Each stage consists of identical parallel machines. The processing time is assumed to include the setup time. This problem is also modeled as a mathematical program. Solution approaches and lower bounding procedures are discussed. I develop lower bounds and heuristic approaches and establish their performance through comprehensive computational experiments.
Degree
thesis:*- Name thesis:degree_name
- Ph.D.
- Level thesis:degree_level
- Dissertation
- Discipline thesis:degree_discipline
- Business Administration
- Grantor
- University of Illinois at Urbana-Champaign
- Date dc:date
- 10000-01-01
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Sinha, Sanjeev
- Contributors dc:contributor
-
- Narayan Raman
Subjects
dc:subject × 1Rights
- Language dc:language
- eng
Identifiers
dc:identifier.*- Identifier
- (MiAaPQ)AAI9737253
- OAI identifier oai:identifier
- oai:www.ideals.illinois.edu:2142/84589