Back to results

University of Illinois at Urbana-Champaign

Value Concept for Developing Construction Pay Schedules With Application to Asphalt Paving

Abstract

dc:description

The primary objective of this study was to develop and demonstrate a rational procedure for the establishment of pavement construction pay adjustment schedules. A rational procedure was defined as one that would reflect the impact of construction variability on the expected life of the pavement. The procedure was required to consider both the mean and the variability of any construction test parameter used for pay determination as determined from a small number of samples and to include a method for incorporating relationships between the test parameters and the expected life of the pavement. The Value Concept developed meets these criteria.

Degree

thesis:*
Name thesis:degree_name
Ph.D.
Level thesis:degree_level
Dissertation
Discipline thesis:degree_discipline
Civil Engineering
Grantor
University of Illinois at Urbana-Champaign
Year dc:date
2014

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Elliott, Robert Patrick

Subjects

dc:subject × 1

Identifiers

dc:identifier.*
Identifier
(UMI)AAI8422057
OAI identifier oai:identifier
oai:www.ideals.illinois.edu:2142/69934

Chain of custody

source
Harvested from
University of Illinois - Urbana-Champaign
Base URL
www.ideals.illinois.edu/oai-pmh
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Elliott, Robert Patrick. Value Concept for Developing Construction Pay Schedules With Application to Asphalt Paving. Dissertation thesis, University of Illinois at Urbana-Champaign, 2014. http://hdl.handle.net/2142/69934