University of Illinois at Urbana-Champaign
An Analysis of the Two-Machine Static, Stochastic Flowshop With Linear Completion Time Costs
Abstract
dc:descriptionThis study investigated the n-job, two-machine, static flowshop with independent, exponential job processing times and linear completion time or penalty costs. The objective was to find a job sequence which minimizes the expected total penalty cost for all the jobs. This performance measure is more complicated and more complete than that used in all the previous analytical, stochastic, multi-machine, flowshop studies; namely, the expected schedule length. The expected total penalty cost for all the jobs is a function of both the penalty cost associated with each job and the expected job completion time.
Degree
thesis:*- Name thesis:degree_name
- Ph.D.
- Level thesis:degree_level
- Dissertation
- Discipline thesis:degree_discipline
- Business Administration
- Grantor
- University of Illinois at Urbana-Champaign
- Year dc:date
- 2014
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Forst, Frank Gregory
Subjects
dc:subject × 1Rights
- Language dc:language
- eng
Identifiers
dc:identifier.*- Identifier
- (UMI)AAI8114423
- OAI identifier oai:identifier
- oai:www.ideals.illinois.edu:2142/67325