University of Illinois at Urbana-Champaign
Control policies for scheduling of semiconductor manufacturing plants
Abstract
dc:descriptionWe study the problem of scheduling large semiconductor manufacturing facilities which can be modeled as re-entrant lines and the stability of such re-entrant lines for several buffer priority and due-date-based policies subject to deterministic bursty arrivals. By stability, we mean that the work-in-process in the system is bounded for all time, or equivalently, the delay of a job flowing through the system is bounded. Not all buffer priority policies are stable, as witnessed by a counterexample which thus instigates the stability study.
Degree
thesis:*- Name thesis:degree_name
- Ph.D.
- Level thesis:degree_level
- Dissertation
- Discipline thesis:degree_discipline
- Electrical Engineering
- Grantor
- University of Illinois at Urbana-Champaign
- Year dc:date
- 2011
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Lu, Steve Chi-Hung
- Contributors dc:contributor
-
- Kumar, P.R.
Subjects
dc:subject × 3Rights
dc:rights- Statement dc:rights
-
- Copyright 1994 Lu, Steve Chi-Hung
- Language dc:language
- eng
Identifiers
dc:identifier.*- Identifier
-
AAI9503259
(UMI)AAI9503259 - OAI identifier oai:identifier
- oai:www.ideals.illinois.edu:2142/22295