University of Illinois at Urbana-Champaign
Job shop scheduling to minimize makespan with explicit material handling considerations
Abstract
dc:descriptionThe efficient operation of a Flexible Manufacturing System (FMS) can be achieved by exploiting (i) Routing Flexibility and (ii) Scheduling Flexibility. Routing flexibility allows the selection of a machine on which an operation should be performed. Scheduling flexibility allows the determination of the processing sequence of jobs on a machine. Typically, the sequence of machines that a job has to visit is fixed and efficiencies can only be obtained by appropriate selection of machine schedules. The resulting problem requires sequencing of jobs on machines and the determination of routes for material handling vehicles. Traditionally, the machine sequences are determined independent of the vehicle routes. We demonstrate that, such a sequential approach often leads to suboptimal schedules. We study the problem of simultaneous scheduling of both the machines and the material handling system.
Degree
thesis:*- Name thesis:degree_name
- Ph.D.
- Level thesis:degree_level
- Dissertation
- Discipline thesis:degree_discipline
- Mechanical Science and Engineering
- Grantor
- University of Illinois at Urbana-Champaign
- Year dc:date
- 2011
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Pandit, Ram
- Contributors dc:contributor
-
- Palekar, Udatta S.
Subjects
dc:subject × 2Rights
dc:rights- Statement dc:rights
-
- Copyright 1990 Pandit, Ram
- Language dc:language
- eng
Identifiers
dc:identifier.*- Identifier
-
AAI9026290
(UMI)AAI9026290 - OAI identifier oai:identifier
- oai:www.ideals.illinois.edu:2142/22207