Monterey, California. Naval Postgraduate School
Operations and maintenance cost for new major U.S. Coast Guard platforms: projected versus actual costs.
Abstract
dc:description.abstractThis thesis examines the accuracy of the operations and maintenance budget models developed for new U.S. Coast Guard cutters and aircraft as part of life cycle cost analysis prior to acquisition. The HU-25A medium range search aircraft and HH-65A short range recovery aircraft were used along with the 270 foot medium endurance cutter and the 110 foot patrol boat. A regression method of estimating these costs using historical costs was explored as an alternative to the laborious task of identifying each major cost element. The results indicated that the budget models are poor predictors and that parametric methods may provide more accuracy. Additional research in developing cost estimating relationships for this purpose is needed.
Degree
thesis:*- Department dc:contributor.department
- Administrative Sciences
- Grantor dc:publisher
- Monterey, California. Naval Postgraduate School
- Year dc:date.issued
- 1989
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Frost, John Ewen
- Advisor dc:contributor.advisor
-
- Fremgen, James M.
Rights
dc:rights- Statement dc:rights
-
- This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
- Language dc:language.iso
- en_US
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/10945/27185
- OAI identifier oai:identifier
- oai:calhoun.nps.edu:10945/27185