{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/27185"},"canonical_url":"https://search.dev.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/27185","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Operations and maintenance cost for new major U.S. Coast Guard platforms: projected versus actual costs.","abstract":"This thesis examines the accuracy of the operations and maintenance budget models developed for new U.S. Coast Guard cutters and aircraft as part of life cycle cost analysis prior to acquisition. The HU-25A medium range search aircraft and HH-65A short range recovery aircraft were used along with the 270 foot medium endurance cutter and the 110 foot patrol boat. A regression method of estimating these costs using historical costs was explored as an alternative to the laborious task of identifying each major cost element. The results indicated that the budget models are poor predictors and that parametric methods may provide more accuracy. Additional research in developing cost estimating relationships for this purpose is needed.","abstract_html":"This thesis examines the accuracy of the operations and maintenance budget models developed for new U.S. Coast Guard cutters and aircraft as part of life cycle cost analysis prior to acquisition. The HU-25A medium range search aircraft and HH-65A short range recovery aircraft were used along with the 270 foot medium endurance cutter and the 110 foot patrol boat. A regression method of estimating these costs using historical costs was explored as an alternative to the laborious task of identifying each major cost element. The results indicated that the budget models are poor predictors and that parametric methods may provide more accuracy. Additional research in developing cost estimating relationships for this purpose is needed.","abstract_has_math":false,"creators":["Frost, John Ewen"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Fremgen, James M."],"committee_chairs":[],"committee_members":[],"year":1989,"date_issued":"1989-06","date_published":"1989-06","updated_at":"2026-07-27T20:25:08Z","subjects":[],"languages":["en_US"],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/27185","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Fremgen, James M."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:creator","label":"Author","values":["Frost, John Ewen"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1989"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-01-23T22:10:10Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-01-23T22:10:10Z"]},{"key":"dc:date.issued","label":"Date","values":["1989-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]},{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/27185"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis examines the accuracy of the operations and maintenance budget models developed for new U.S. Coast Guard cutters and aircraft as part of life cycle cost analysis prior to acquisition. The HU-25A medium range search aircraft and HH-65A short range recovery aircraft were used along with the 270 foot medium endurance cutter and the 110 foot patrol boat. A regression method of estimating these costs using historical costs was explored as an alternative to the laborious task of identifying each major cost element. The results indicated that the budget models are poor predictors and that parametric methods may provide more accuracy. Additional research in developing cost estimating relationships for this purpose is needed."]},{"key":"dc:title","label":"Title","values":["Operations and maintenance cost for new major U.S. Coast Guard platforms: projected versus actual costs."]}]}],"canonical_facts":{"dc:contributor.advisor":["Fremgen, James M."],"dc:contributor.department":["Administrative Sciences"],"dc:creator":["Frost, John Ewen"],"dc:date":["June 1989"],"dc:date.accessioned":["2013-01-23T22:10:10Z"],"dc:date.available":["2013-01-23T22:10:10Z"],"dc:date.issued":["1989-06"],"dc:description.abstract":["This thesis examines the accuracy of the operations and maintenance budget models developed for new U.S. Coast Guard cutters and aircraft as part of life cycle cost analysis prior to acquisition. The HU-25A medium range search aircraft and HH-65A short range recovery aircraft were used along with the 270 foot medium endurance cutter and the 110 foot patrol boat. A regression method of estimating these costs using historical costs was explored as an alternative to the laborious task of identifying each major cost element. The results indicated that the budget models are poor predictors and that parametric methods may provide more accuracy. Additional research in developing cost estimating relationships for this purpose is needed."],"dc:identifier.uri":["https://hdl.handle.net/10945/27185"],"dc:language.iso":["en_US"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Operations and maintenance cost for new major U.S. Coast Guard platforms: projected versus actual costs."],"dc:type":["Thesis"]},"updated_at":"2026-07-27T20:25:08Z"}