Back to results

Monterey, California. Naval Postgraduate School

A cost comparison of alternative methods for fleet introduction of the CG 47 class

Abstract

dc:description.abstract

Manning of new construction ships in preparation for fleet introduction requires the utilization of considerable Navy resources, both in terms of personnel lost to the fleet and dollar costs. Criticism by the General Accounting Office and Navy self-evaluation of new construction manning occurred in the 1969-1971 time-frame and resulted in the development of the Fleet Introduction Team concept. The CG 47 Class Guided Missile Cruiser construction program has fostered another alternative method for accomplishing fleet introduction, pat­terned after the manning concept employed in nuclear powered ship construction programs. The objective of the thesis is to evaluate the various methods of introducing a new construction ship into the fleet by accomplishing a cost compari­son of different methodologies and to provide a model which can be used by the Navy on future programs to perform such an evaluation. The author's conclusions are; 1) the nucleus crew, balance crew concept is becoming obsolete, 2) use of the Fleet Introduction Team concept should be expanded, and 3) there is a need for early decisions relative to manning new construction ships.

Degree

thesis:*
Department dc:contributor.department
Administrative Sciences
Grantor dc:publisher
Monterey, California. Naval Postgraduate School
Year dc:date.issued
1980

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Johnson, Delmont Scott
Advisor dc:contributor.advisor
  • Bobulinski, Robert A.

Rights

dc:rights
Statement dc:rights
  • This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.
Language dc:language.iso
en_US

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/18943
OAI identifier oai:identifier
oai:calhoun.nps.edu:10945/18943

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-07-27
Source record
OAI-PMH GetRecord
related terms
citation

Johnson, Delmont Scott. A cost comparison of alternative methods for fleet introduction of the CG 47 class. Monterey, California. Naval Postgraduate School, 1980. https://hdl.handle.net/10945/18943