Back to results

Monterey, CA; Naval Postgraduate School

A first step towards zero down time: the creation of synergy through equipment acquisition within the constraints of a small budget in an Army with civilian oversight - a case of the Botswana Defense Force (BDF)

Abstract

dc:description.abstract

This thesis seeks to explore the satisfaction levels for variables that should be considered when procuring equipment in the BDF. It is believed that this investigation should lead to a statistical model specific to the BDF's procurement methods. New methods of acquisition are now demanded by the PPADB; hence new metrics have to be applied to strike an accord with the new requirements of buying for government. The null hypothesis, Ho, for this thesis is that: Downtime or turnaround time (TAT) cannot be reduced by favorable independent variables. This follows from the preliminary conclusion that there is substantial downtime as at present. It postulates that something can be done to ameliorate past mishaps. The null hypothesis therefore assumes that this will continue to prevail no matter what is done. The alternative hypothesis, Ha, is that: TAT can be reduced by favorable independent variables. The results show substantial dissatisfaction with the procurement methods of the BDF. Further research is recommended in the light of the weakness of the resultant regression model, which gave R2 = 29%.

Degree

thesis:*
Grantor dc:publisher
Monterey, CA; Naval Postgraduate School
Year dc:date.issued
2005

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Mompati, Mothusi Glendon
Advisor dc:contributor.advisor
  • Kang, Keebom

Rights

dc:rights
Statement dc:rights
  • Copyright is reserved by the copyright owner.

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10945/10017
OAI identifier oai:identifier
oai:calhoun.nps.edu:10945/10017

Chain of custody

source
Harvested from
Naval Postgraduate School
Base URL
calhoun.nps.edu/server/oai/request
Last updated
2026-07-27
Source record
OAI-PMH GetRecord
related terms
citation

Mompati, Mothusi Glendon. A first step towards zero down time: the creation of synergy through equipment acquisition within the constraints of a small budget in an Army with civilian oversight - a case of the Botswana Defense Force (BDF). Monterey, CA; Naval Postgraduate School, 2005. https://hdl.handle.net/10945/10017