Back to results

Massachusetts Institute of Technology

Right sizing for government review

Abstract

dc:description.abstract

The U.S. Navy has changed many of its acquisition practices. One of these changes is from performing the early design work primarily in-house, to contracting private shipyards to do the design. This change has shifted the government's role in design to a predominantly review function. Therefore, the government needs to decide what level of review should be performed, and how much this will cost in the future. This research examines the Strategic Sealift acquisition program, which was one of the first programs that employed this new acquisition strategy. The costs of the design stages are identified, and the level of review is described. This research can be compared to later programs, and possibly used as a benchmark for future programs.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Dept. of Ocean Engineering.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
1998

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Speirs, Andrew T. (Andrew Todd), 1975-
Advisor dc:contributor.advisor
  • Henry S. Marcus.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/50616
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/50616

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
related terms
citation

Speirs, Andrew T. (Andrew Todd), 1975-. Right sizing for government review. Massachusetts Institute of Technology, 1998. http://hdl.handle.net/1721.1/50616