{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/50616"},"canonical_url":"https://search.dev.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/50616","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Right sizing for government review","abstract":"The U.S. Navy has changed many of its acquisition practices. One of these changes is from performing the early design work primarily in-house, to contracting private shipyards to do the design. This change has shifted the government's role in design to a predominantly review function. Therefore, the government needs to decide what level of review should be performed, and how much this will cost in the future. This research examines the Strategic Sealift acquisition program, which was one of the first programs that employed this new acquisition strategy. The costs of the design stages are identified, and the level of review is described. This research can be compared to later programs, and possibly used as a benchmark for future programs.","abstract_html":"The U.S. Navy has changed many of its acquisition practices. One of these changes is from performing the early design work primarily in-house, to contracting private shipyards to do the design. This change has shifted the government&#x27;s role in design to a predominantly review function. Therefore, the government needs to decide what level of review should be performed, and how much this will cost in the future. This research examines the Strategic Sealift acquisition program, which was one of the first programs that employed this new acquisition strategy. The costs of the design stages are identified, and the level of review is described. This research can be compared to later programs, and possibly used as a benchmark for future programs.","abstract_has_math":false,"creators":["Speirs, Andrew T. (Andrew Todd), 1975-"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Massachusetts Institute of Technology. Dept. of Ocean Engineering.","school":null,"contributors":[],"advisors":["Henry S. Marcus."],"committee_chairs":[],"committee_members":[],"year":1998,"date_issued":"1998","date_published":"1998","updated_at":"2026-07-22T22:21:44Z","subjects":["Ocean Engineering."],"languages":["eng"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1721.1/50616","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Henry S. Marcus."]},{"key":"dc:contributor.department","label":"Department","values":["Massachusetts Institute of Technology. Dept. of Ocean Engineering."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Dept. of Ocean Engineering."]},{"key":"dc:creator","label":"Author","values":["Speirs, Andrew T. (Andrew Todd), 1975-"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2010-01-07T21:01:34Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2010-01-07T21:01:34Z"]},{"key":"dc:date.issued","label":"Date","values":["1998"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Ocean Engineering."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/50616"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Ocean Engineering, 1998.","Includes bibliographical references (leaf 91)."]},{"key":"dc:description.abstract","label":"Abstract","values":["The U.S. Navy has changed many of its acquisition practices. One of these changes is from performing the early design work primarily in-house, to contracting private shipyards to do the design. This change has shifted the government's role in design to a predominantly review function. Therefore, the government needs to decide what level of review should be performed, and how much this will cost in the future. This research examines the Strategic Sealift acquisition program, which was one of the first programs that employed this new acquisition strategy. The costs of the design stages are identified, and the level of review is described. This research can be compared to later programs, and possibly used as a benchmark for future programs."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M."]},{"key":"dc:title","label":"Title","values":["Right sizing for government review"]}]}],"canonical_facts":{"dc:contributor.advisor":["Henry S. Marcus."],"dc:contributor.department":["Massachusetts Institute of Technology. Dept. of Ocean Engineering."],"dc:contributor.other":["Massachusetts Institute of Technology. Dept. of Ocean Engineering."],"dc:creator":["Speirs, Andrew T. (Andrew Todd), 1975-"],"dc:date.accessioned":["2010-01-07T21:01:34Z"],"dc:date.available":["2010-01-07T21:01:34Z"],"dc:date.issued":["1998"],"dc:description":["Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Ocean Engineering, 1998.","Includes bibliographical references (leaf 91)."],"dc:description.abstract":["The U.S. Navy has changed many of its acquisition practices. One of these changes is from performing the early design work primarily in-house, to contracting private shipyards to do the design. This change has shifted the government's role in design to a predominantly review function. Therefore, the government needs to decide what level of review should be performed, and how much this will cost in the future. This research examines the Strategic Sealift acquisition program, which was one of the first programs that employed this new acquisition strategy. The costs of the design stages are identified, and the level of review is described. This research can be compared to later programs, and possibly used as a benchmark for future programs."],"dc:description.degree":["S.M."],"dc:identifier.uri":["http://hdl.handle.net/1721.1/50616"],"dc:language.iso":["eng"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Ocean Engineering."],"dc:title":["Right sizing for government review"],"dc:type":["Thesis"]},"updated_at":"2026-07-22T22:21:44Z"}