Massachusetts Institute of Technology
Multiple-part-type production scheduling for high volume manufacturing (time-based approach)
Abstract
dc:description.abstractAn effective production scheduling strategy would lead to efficient production line performance as well as increased profit. However, there is no fixed or generalized solution. In this thesis, Nonlinear Programming and time-based Control Point Policy were applied in sequence to solve the production scheduling problems at a high volume industry. The strategy provided the company a systematic way to tackle production problems. A distinct tradeoff between average inventory and frequency of changeover is observed. A recommended selection is made based on minimizing total cost (inventory holding cost and changeover cost). Comparing with current line behavior, the recommended selection will reduce the total cost by more than half.
Degree
thesis:*- Department dc:contributor.department
- Massachusetts Institute of Technology. Dept. of Mechanical Engineering.
- Grantor dc:publisher
- Massachusetts Institute of Technology
- Year dc:date.issued
- 2008
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Xie, Zhiyu, M. Eng. Massachusetts Institute of Technology
- Advisor dc:contributor.advisor
-
- Stanley B. Gershwin.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
- Licence dc:rights.uri
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/1721.1/46540
- OAI identifier oai:identifier
- oai:dspace.mit.edu:1721.1/46540