Back to results

Massachusetts Institute of Technology

Process improvements during production ramp-up

Abstract

dc:description.abstract

Raytheon Company is currently ramping up production radars for a fighter aircraft. This product is doubling production in the next year to meet customer demand; however, the program has not been able to meet the current demand schedule for the radar. In addition, the cost of producing this radar is over the budgeted amount. Management is pushing cost and cycle time reductions on every piece of the radar, a task the team is diligently working to accomplish. The main focus of this project is one sub-assembly of the AESA radar system, the "coldwall", a heat sink that also provides the base structure by which all of the radar sensing equipment is connect to. The coldwall also acts as a heat sink, reducing the internal temperature of the radar assembly, thereby improving the fidelity of the radio frequency signal and longevity of the system itself. Currently, the cycle time to manufacture the coldwall is on average twice the planned cycle time and the cost is three times the budgeted amount. This thesis provides a case in which a process improvement investigation takes place under tight budgetary and time constraints in ramp-up mode.

Degree

thesis:*
Department dc:contributor.department
Leaders for Manufacturing Program at MIT
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2007

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Chew, Ryan W. (Ryan Wayne)
Advisor dc:contributor.advisor
  • Donald B. Rosenfield and David E. Hardt.

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/39589
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/39589

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Chew, Ryan W. (Ryan Wayne). Process improvements during production ramp-up. Massachusetts Institute of Technology, 2007. http://hdl.handle.net/1721.1/39589