Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 502 for “"RAMP"”.
-
Ramp event analysis for western Missouri
… and decreases in wind speed that produce "ramps" which affect wind power calculations and planning. Average wind speeds are predicted with a high level of accuracy; however variable winds that contain ramp events are not represented very accurately. To better understand variability in …
-
Process improvements during production ramp-up
Raytheon Company is currently ramping up production radars for a fighter aircraft. This product is doubling production in the next year to meet customer demand; however, the program has not been able to meet the current demand schedule for the radar. In addition, the cost of producing this radar is …
-
Performance measurement in the RAMP SMP facility.
The Rapid Acquisition of Manufactured Parts (RAMP) program is a Navy initiative to address the problems of high cost, growing leadtime and diminishing sources for spare parts. RAMP addresses this by developing digital parts technical data and computer integrated manufacturing (CIM) capability …
-
Tape automated bonding--product and process ramp-up
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Materials Science and Engineering, 1990, and Thesis (M.S.)--Massachusetts Institute of Technology, Sloan School of Management, 1990.
-
Evaluation of two-lane ramp merges on urban freeways
Thesis (M.S.)--Michigan State University. Dept. of Civil Engineering, 1971
-
Boundary Layer Separation Control on a Salient Back-facing Ramp
… on 15° and 30° deflected, backward-facing ramps. Parameterizing the device spacing and the device-height-to-chord ratio assesses the performance change with different configurations. In addition to the serration geometries, two other improvements, partitioning plates and tip treatments, are …
-
Production ramp-up capability : developing a framework and a process
… with developing an understanding of production ramp-up and a process for firms to attain improved volume ramp-up capability in the context of international manufacturing supply networks. As major multinational corporations (MNCs) continue to deploy outsourcing strategies globally, traditional …
-
Emulation of microprocessor memory systems using the RAMP design framework
… world focused on multiprocessor systems, the RAMP project is aiming to provide the infrastructure for supporting high-speed emulation of large scale, massively-parallel multiprocessor systems using FPGAs. The RAMP design framework provides the platform for building this infrastructure. This …
-
Biomechanical Adaptations to an Implemented Ramp Angle in Recreational Alpine Skiers
… ski boot-binding complexes have a negative ramp angle. This angle is not regulated or reported in the alpine ski industry, but may influence skier balance and pressure control. Thus, joint coordination and center of pressure maintenance in alpine skiers (n = 19) was investigated during …
-
Dynamic multi-ramp metering control with simultaneous perturbation stochastic approximation (SPSA)
Ramp metering was proven to be a viable form of freeway traffic control strategy, which could eliminate, or at least reduce, freeway congestion. In this study, the development of ramp metering control strategies, models, and constraints (e.g., meter locations, ramp storage capacities, lower and …
-
Conductivity and Interferometry Experiments on YBCO/lead Ramp-Edge Josephson Junctions
… superconductor YBa 2Cu3O7-y (YBCO) using YBCO/Pb ramp-edge Josephson junctions with lithographically defined corner and straight-edge geometries. Measurements of the critical current versus applied field, I c(H), and the an dynamic conductance, dI/dV, are presented. For junctions with corner …
-
Conductivity and Interferometry experiments on YBCO/Pb Ramp-Edge Josephson Junctions
Submitted by Meng Tao (mengtao2@illinois.edu) on 2012-10-13T02:26:38Z No. of bitstreams: 1 hilliard.pdf: 21104520 bytes, checksum: 04a718c8258d783f199317b7e9ea37a4 (MD5)
-
Resilient operations of smart highways : platooning, ramp metering, and incident management
… types of highway operations: vehicle platooning, ramp metering, and capacity-aware routing/demand management. Our approach relies on (i) modeling partially automated traffic flow dynamics under disruptions as stochastically switching dynamical systems, (ii) analyzing their long-time properties …
-
Accelerating time-to-money for a semiconductor wafer fab capacity ramp
Thesis (M.S.)--Massachusetts Institute of Technology, Sloan School of Management, 1996, and Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Materials Science & Engineering, 1996.
-
Short term modification of vergence ramp eye movements in the convergent direction
… effects of short-term modification on vergence ramp movements. Thus, this study explores the trends observed within a short-term modification experiment studying smoothly tracking vergence eye movements responses elicited from convergent ramp stimuli. A short-term modification experiment is …
-
Evaluation of coordinated and local ramp metering algorithm using microscopic traffic simulation
Ramp meters are special traffic signals at the end of a freeway on-ramp that regulate the flow of traffic onto the mainline. The main purpose of ramp meters is to keep the mainline of the freeway from becoming overly congested, and to maximize the efficient use of freeway capacity. The first use of …
-
Evaluation of ramp control algorithms using a microscopic traffic simulation laboratory, MITSIM
Ramp metering has emerged as an effective freeway control measure to ensure efficient freeway operations. A number of algorithms have been developed in recent years to ensure an effective use of ramp metering. As the performance of ramp metering depends on various factors (e.g. traffic volume, …
-
Renaissance of the ramp : reconceptualization of National Assembly's architectural symbolism and accessibility
… to answer questions. Creating a space of ramps will heighten perceptions of accessibility of the National Assembly. The plaza becomes the place of communication as it establishes a new relationship between the space of the ramp and the National Assembly. Today, the perception of the …
Page 1 of 26