Back to results

Massachusetts Institute of Technology

Schedule and cost estimate for an innovative Boston Harbor concert hall

Abstract

dc:description.abstract

This thesis formulates a cost estimate and schedule for constructing the Boston Concert Hall, an innovative hypothetical building composed of two concert halls and a restaurant. Concert Halls are complex and expensive structures due to steep design requirements reflecting their status as signature buildings and because they require extensive furnishing. Restaurants are not as complex but require the same kind of attention in their interior furnishing as well as in the choice of their kitchen equipment. Because the structure houses two complicated entities, feasibility analysis required a careful cost and schedule estimation. On the basis of several assumptions, a rough estimate of the cost and schedule of the entire structure has been developed along with a more detailed estimate of the two auditoriums and the restaurant. The study suggests that the interior finishing of such unique buildings represent a large fraction of their overall costs and construction time.

Degree

thesis:*
Department dc:contributor.department
Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering.
Grantor dc:publisher
Massachusetts Institute of Technology
Year dc:date.issued
2004

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Coste, Amelie, 1982-
Advisor dc:contributor.advisor
  • Jerome J. Connor and Nathaniel Osgood.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1721.1/30134
OAI identifier oai:identifier
oai:dspace.mit.edu:1721.1/30134

Chain of custody

source
Harvested from
MIT
Base URL
dspace.mit.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Coste, Amelie, 1982-. Schedule and cost estimate for an innovative Boston Harbor concert hall. Massachusetts Institute of Technology, 2004. http://hdl.handle.net/1721.1/30134