Back to results

Universidad de Lima

Application of the ABC methodology to reduce the delay of sales orders in a company warehouse in Barranca city

Abstract

dc:description.abstract

Inventory management becomes more important as companies grow; therefore, it is important to improve its internal processes by seeking efficient storage methods. The processes were analyzed using problem diagnosis tools and it was observed that more than 15% of the total orders are delayed, and more than 80% are due to the fact that there is no specific location of the products in the warehouse. Under this problem, the implementation of the ABC methodology is proposed, which allowed dividing the large number of products that the company sells into families and classifying them into groups A, B and C. Subsequently, the entire company warehouse was divided into zones. Arena software was used to compare the results between the current situation and the improvement implemented. According to the results obtained, it was shown that from a reduction in picking times of 20% or more, the improvements implemented would be significant, and so it was. A reduction in picking time of approximately 33% was achieved, and late orders per day decreased on average from [5.03 ± 1.5] to [1.83 ± 0.56] orders.

Degree

thesis:*
Name thesis:degree_name
Ingeniero Industrial
Level thesis:degree_level
Título Profesional
Discipline thesis:degree_discipline
Ingeniería Industrial
Grantor dc:publisher
Universidad de Lima
Year dc:date.issued
2023

Author and committee

dc:creator, dc:contributor.*
Authors dc:creator
  • Santa Cruz Puente, Carlos Abel
  • Wu Gamarra, Joe Pui Lo
Advisor dc:contributor.advisor
  • Villanueva Flores, Rafael Mauricio

Subjects

dc:subject × 6

Rights

dc:rights
Statement dc:rights
  • info:eu-repo/semantics/openAccess
Language dc:language.iso
eng

Identifiers

dc:identifier.*
OAI identifier oai:identifier
oai:repositorio.ulima.edu.pe:20.500.12724/19393

Chain of custody

source
Harvested from
Universidad de Lima
Base URL
repositorio.ulima.edu.pe/oai/request
Last updated
2026-07-24
Source record
OAI-PMH GetRecord
citation

Santa Cruz Puente, Carlos Abel; Wu Gamarra, Joe Pui Lo. Application of the ABC methodology to reduce the delay of sales orders in a company warehouse in Barranca city. Título Profesional thesis, Universidad de Lima, 2023. https://hdl.handle.net/20.500.12724/19393