Back to results

Thames Polytechnic

Time prediction: an alternative approach

Abstract

dc:description.abstract

The construction industry and its commercial and industrial clients have become increasingly aware of the importance of time in the planning and construction of projects. A comparison of the construction industries in the UK and the USA concluded that orthodox contract procedures in the UK are largely determined by public sector requirements of accountbility and control, whereas private sector requirements are for speed and a clear allocation of responsibilities and tasks. The important relationship between time and cost has not been studied to any extent in UK practice. It is clear from the little research that has been undertaken that the subjective methods of time prediction adopted by surveyors in the UK are far from being adequate when it can only be expected that 50% of contracts will meet the stipulated contract period. The problem is one of trying to predict a time period without being able to fully anticipate all possible future events. To date the industry has had no scientific method of making that time prediction, moreover it is often left simply to the judgement of a professional quantity surveyor. In order to provide a better and more effective time and cost control system, it is imperative that a more accurate system or predicting time is devised. This research then aims to identify the factors affecting the time aspect of construction, to suggest which of those could be anticipated at a given point during the design procedure and to prepare a model whereby the time for construction can be accurately predicted.

Degree

thesis:*
Level dc:type.qualificationlevel
mphil
Grantor dc:publisher.institution
Thames Polytechnic
Year dc:date.issued
1988

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Mehrtens, Ian Nigel
Advisor dc:contributor.advisor
  • Agha, M.

Subjects

dc:subject × 1

Rights

Language dc:language
en

Chain of custody

source
Harvested from
University of Greenwich
Base URL
gala.gre.ac.uk/cgi/oai2
Last updated
2026-07-24
Source record
OAI-PMH GetRecord
citation

Mehrtens, Ian Nigel. Time prediction: an alternative approach. mphil thesis, Thames Polytechnic, 1988.