{"id":{"repo_id":"greenwich","oai_identifier":"oai:gala.gre.ac.uk:8631"},"canonical_url":"https://search.dev.ndltd.org/etd/greenwich/oai:gala.gre.ac.uk:8631","repository":{"repo_id":"greenwich","name":"University of Greenwich","base_url":"https://gala.gre.ac.uk/cgi/oai2"},"display":{"title":"Time prediction: an alternative approach","abstract":"The construction industry and its commercial and industrial clients have become increasingly aware of the importance of time in the planning and construction of projects. A comparison of the construction industries in the UK and the USA concluded that orthodox contract procedures in the UK are largely determined by public sector requirements of accountbility and control, whereas private sector requirements are for speed and a clear allocation of responsibilities and tasks. The important relationship between time and cost has not been studied to any extent in UK practice. It is clear from the little research that has been undertaken that the subjective methods of time prediction adopted by surveyors in the UK are far from being adequate when it can only be expected that 50% of contracts will meet the stipulated contract period. The problem is one of trying to predict a time period without being able to fully anticipate all possible future events. To date the industry has had no scientific method of making that time prediction, moreover it is often left simply to the judgement of a professional quantity surveyor. In order to provide a better and more effective time and cost control system, it is imperative that a more accurate system or predicting time is devised. This research then aims to identify the factors affecting the time aspect of construction, to suggest which of those could be anticipated at a given point during the design procedure and to prepare a model whereby the time for construction can be accurately predicted.","abstract_html":"The construction industry and its commercial and industrial clients have become increasingly aware of the importance of time in the planning and construction of projects. A comparison of the construction industries in the UK and the USA concluded that orthodox contract procedures in the UK are largely determined by public sector requirements of accountbility and control, whereas private sector requirements are for speed and a clear allocation of responsibilities and tasks. The important relationship between time and cost has not been studied to any extent in UK practice. It is clear from the little research that has been undertaken that the subjective methods of time prediction adopted by surveyors in the UK are far from being adequate when it can only be expected that 50% of contracts will meet the stipulated contract period. The problem is one of trying to predict a time period without being able to fully anticipate all possible future events. To date the industry has had no scientific method of making that time prediction, moreover it is often left simply to the judgement of a professional quantity surveyor. In order to provide a better and more effective time and cost control system, it is imperative that a more accurate system or predicting time is devised. This research then aims to identify the factors affecting the time aspect of construction, to suggest which of those could be anticipated at a given point during the design procedure and to prepare a model whereby the time for construction can be accurately predicted.","abstract_has_math":false,"creators":["Mehrtens, Ian Nigel"],"institution":"Thames Polytechnic","degree_name":null,"degree_level":"mphil","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Agha, M."],"committee_chairs":[],"committee_members":[],"year":1988,"date_issued":"1988-11","date_published":"1988-11","updated_at":"2026-07-24T02:25:42Z","subjects":["QA Mathematics"],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Agha, M."]},{"key":"dc:creator","label":"Author","values":["Mehrtens, Ian Nigel"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1988-11"]},{"key":"dc:date.issued","label":"Date","values":["1988-11"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["School of Mathematics, Statistics and Computing"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["Thames Polytechnic"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["https://gala.gre.ac.uk/id/eprint/8631/"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["mphil"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["QA Mathematics"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["en"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://gala.gre.ac.uk/id/eprint/8631/1/Ian_Nigel_Mehrtens_1988.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The construction industry and its commercial and industrial clients have become increasingly aware of the importance of time in the planning and construction of projects. A comparison of the construction industries in the UK and the USA concluded that orthodox contract procedures in the UK are largely determined by public sector requirements of accountbility and control, whereas private sector requirements are for speed and a clear allocation of responsibilities and tasks. The important relationship between time and cost has not been studied to any extent in UK practice. It is clear from the little research that has been undertaken that the subjective methods of time prediction adopted by surveyors in the UK are far from being adequate when it can only be expected that 50% of contracts will meet the stipulated contract period. The problem is one of trying to predict a time period without being able to fully anticipate all possible future events. To date the industry has had no scientific method of making that time prediction, moreover it is often left simply to the judgement of a professional quantity surveyor. In order to provide a better and more effective time and cost control system, it is imperative that a more accurate system or predicting time is devised. This research then aims to identify the factors affecting the time aspect of construction, to suggest which of those could be anticipated at a given point during the design procedure and to prepare a model whereby the time for construction can be accurately predicted."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Time prediction: an alternative approach"]}]}],"canonical_facts":{"dc:contributor.advisor":["Agha, M."],"dc:creator":["Mehrtens, Ian Nigel"],"dc:date":["1988-11"],"dc:date.issued":["1988-11"],"dc:description.abstract":["The construction industry and its commercial and industrial clients have become increasingly aware of the importance of time in the planning and construction of projects. A comparison of the construction industries in the UK and the USA concluded that orthodox contract procedures in the UK are largely determined by public sector requirements of accountbility and control, whereas private sector requirements are for speed and a clear allocation of responsibilities and tasks. The important relationship between time and cost has not been studied to any extent in UK practice. It is clear from the little research that has been undertaken that the subjective methods of time prediction adopted by surveyors in the UK are far from being adequate when it can only be expected that 50% of contracts will meet the stipulated contract period. The problem is one of trying to predict a time period without being able to fully anticipate all possible future events. To date the industry has had no scientific method of making that time prediction, moreover it is often left simply to the judgement of a professional quantity surveyor. In order to provide a better and more effective time and cost control system, it is imperative that a more accurate system or predicting time is devised. This research then aims to identify the factors affecting the time aspect of construction, to suggest which of those could be anticipated at a given point during the design procedure and to prepare a model whereby the time for construction can be accurately predicted."],"dc:format":["application/pdf"],"dc:identifier.uri":["https://gala.gre.ac.uk/id/eprint/8631/1/Ian_Nigel_Mehrtens_1988.pdf"],"dc:language":["en"],"dc:publisher.department":["School of Mathematics, Statistics and Computing"],"dc:publisher.institution":["Thames Polytechnic"],"dc:relation.isreferencedby":["https://gala.gre.ac.uk/id/eprint/8631/"],"dc:subject":["QA Mathematics"],"dc:title":["Time prediction: an alternative approach"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["mphil"]},"updated_at":"2026-07-24T02:25:42Z"}