Back to results

Embry Riddle Aeronautical University

USAir: Balancing Terminal Facilities and Runway Capacity at Pittsburgh

Abstract

dc:description.abstract

<p>As a result of expansion and acquisition, USAir has experienced major growth in flight operations. In an effort to accommodate this expansion, a major construction project, called the Midfield Terminal project, is underway at USAir's major hub, Greater Pittsburgh International Airport (PIT). The Midfield Terminal will result in a 60 percent increase in gate capacity for USAir and lower operating costs due to its location. However, increased gates infer increased flight frequencies. PIT already operates near capacity during peak periods and runway expansion has only been discussed. This paper evaluates the conditions of USAir at PIT with regard to the lack of landing facilities and gate expansion. There will be a dire need for additional runway capacity at PIT if USAir is to take advantage of the additional gates and the cost savings associated with those gates. Suggestions are made to avoid a critical imbalance of airport facilities.</p>

Degree

thesis:*
Name thesis:degree_name
Master of Business Administration in Aviation
Level thesis:degree_level
Thesis - Open Access
Discipline thesis:degree_discipline
Aviation Business Administration
Year
1990

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Mattern, Edward J.
Contributors dc:contributor
  • Rudolf Knabe
  • John Pope
  • Carl Lippold

Subjects

dc:subject × 7

Identifiers

dc:identifier.*
Repository record dc:identifier
https://commons.erau.edu/db-theses/258
OAI identifier oai:identifier
oai:commons.erau.edu:db-theses-1187

Chain of custody

source
Harvested from
Embry Riddle Aeronautical University
Base URL
commons.erau.edu/do/oai/
Last updated
2026-07-27
Source record
OAI-PMH GetRecord
citation