{"id":{"repo_id":"embry-riddle","oai_identifier":"oai:commons.erau.edu:db-theses-1187"},"canonical_url":"https://search.dev.ndltd.org/etd/embry-riddle/oai:commons.erau.edu:db-theses-1187","repository":{"repo_id":"embry-riddle","name":"Embry Riddle Aeronautical University","base_url":"https://commons.erau.edu/do/oai/"},"display":{"title":"USAir: Balancing Terminal Facilities and Runway Capacity at Pittsburgh","abstract":"<p>As a result of expansion and acquisition, USAir has experienced major growth in flight operations. In an effort to accommodate this expansion, a major construction project, called the Midfield Terminal project, is underway at USAir's major hub, Greater Pittsburgh International Airport (PIT). The Midfield Terminal will result in a 60 percent increase in gate capacity for USAir and lower operating costs due to its location. However, increased gates infer increased flight frequencies. PIT already operates near capacity during peak periods and runway expansion has only been discussed. This paper evaluates the conditions of USAir at PIT with regard to the lack of landing facilities and gate expansion. There will be a dire need for additional runway capacity at PIT if USAir is to take advantage of the additional gates and the cost savings associated with those gates. Suggestions are made to avoid a critical imbalance of airport facilities.</p>","abstract_html":"&lt;p&gt;As a result of expansion and acquisition, USAir has experienced major growth in flight operations. In an effort to accommodate this expansion, a major construction project, called the Midfield Terminal project, is underway at USAir&#x27;s major hub, Greater Pittsburgh International Airport (PIT). The Midfield Terminal will result in a 60 percent increase in gate capacity for USAir and lower operating costs due to its location. However, increased gates infer increased flight frequencies. PIT already operates near capacity during peak periods and runway expansion has only been discussed. This paper evaluates the conditions of USAir at PIT with regard to the lack of landing facilities and gate expansion. There will be a dire need for additional runway capacity at PIT if USAir is to take advantage of the additional gates and the cost savings associated with those gates. Suggestions are made to avoid a critical imbalance of airport facilities.&lt;/p&gt;","abstract_has_math":false,"creators":["Mattern, Edward J."],"institution":null,"degree_name":"Master of Business Administration in Aviation","degree_level":"Thesis - Open Access","degree_discipline":"Aviation Business Administration","degree_department":null,"school":null,"contributors":["Rudolf Knabe","John Pope","Carl Lippold"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1990,"date_issued":"1990-08-01T07:00:00Z","date_published":"1990-08-01T07:00:00Z","updated_at":"2026-07-27T19:26:16Z","subjects":["USAir","terminals","runways","airlines","Pittsburg","Aviation","Management and Operations"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[]},"links":{"outbound_url":"https://commons.erau.edu/db-theses/258","outbound_label":"Repository record","outbound_source":"dc:identifier"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Rudolf Knabe","John Pope","Carl Lippold"]},{"key":"dc:creator","label":"Author","values":["Mattern, Edward J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"thesis:degree_discipline","label":"Discipline","values":["Aviation Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis - Open Access"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration in Aviation"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["USAir","terminals","runways","airlines","Pittsburg","Aviation","Management and Operations"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://commons.erau.edu/db-theses/258"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["<p>As a result of expansion and acquisition, USAir has experienced major growth in flight operations. In an effort to accommodate this expansion, a major construction project, called the Midfield Terminal project, is underway at USAir's major hub, Greater Pittsburgh International Airport (PIT). The Midfield Terminal will result in a 60 percent increase in gate capacity for USAir and lower operating costs due to its location. However, increased gates infer increased flight frequencies. PIT already operates near capacity during peak periods and runway expansion has only been discussed. This paper evaluates the conditions of USAir at PIT with regard to the lack of landing facilities and gate expansion. There will be a dire need for additional runway capacity at PIT if USAir is to take advantage of the additional gates and the cost savings associated with those gates. Suggestions are made to avoid a critical imbalance of airport facilities.</p>"]},{"key":"dc:title","label":"Title","values":["USAir: Balancing Terminal Facilities and Runway Capacity at Pittsburgh"]}]}],"canonical_facts":{"dc:contributor":["Rudolf Knabe","John Pope","Carl Lippold"],"dc:creator":["Mattern, Edward J."],"dc:description.abstract":["<p>As a result of expansion and acquisition, USAir has experienced major growth in flight operations. In an effort to accommodate this expansion, a major construction project, called the Midfield Terminal project, is underway at USAir's major hub, Greater Pittsburgh International Airport (PIT). The Midfield Terminal will result in a 60 percent increase in gate capacity for USAir and lower operating costs due to its location. However, increased gates infer increased flight frequencies. PIT already operates near capacity during peak periods and runway expansion has only been discussed. This paper evaluates the conditions of USAir at PIT with regard to the lack of landing facilities and gate expansion. There will be a dire need for additional runway capacity at PIT if USAir is to take advantage of the additional gates and the cost savings associated with those gates. Suggestions are made to avoid a critical imbalance of airport facilities.</p>"],"dc:identifier":["https://commons.erau.edu/db-theses/258"],"dc:subject":["USAir","terminals","runways","airlines","Pittsburg","Aviation","Management and Operations"],"dc:title":["USAir: Balancing Terminal Facilities and Runway Capacity at Pittsburgh"],"thesis:degree_discipline":["Aviation Business Administration"],"thesis:degree_level":["Thesis - Open Access"],"thesis:degree_name":["Master of Business Administration in Aviation"]},"updated_at":"2026-07-27T19:26:16Z"}