Reengineering construction operations
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1994.
-
Enabling 3D Visualization of Simulated Construction Operations
… can substantially help in designing complex construction operations and in making optimal decisions where traditional methods prove ineffective or are unfeasible. However, there has been limited use of simulation in planning construction operations due to the unavailability of appropriate …
-
A Common Taxonomy for Modeling Construction Operations
The construction industry continues to strive for new ways to improve construction operations. This requires better understanding and analysis of these operations, which necessitates a way to systematically capture and analyze the diverse elements involved. The dynamic nature of construction is …
-
Optimizing Lighting Conditions for Nighttime Highway Construction Operations
"First, a practical framework named Construction Visual Requirements Framework "" CONVISUAL"" is developed to establish objective lighting design criteria for nighttime highway construction in order to minimize the subjectivity and discrepancy in available lighting standards adopted by different …
-
Application of Mathematical Models in Planning Construction Operations
Made available in DSpace on 2015-05-12T17:06:28Z (GMT). No. of bitstreams: 2 license.txt: 4848 bytes, checksum: 96035ab3f5e1c23cc7138a224ce498bd (MD5) 6200673.PDF: 6807247 bytes, checksum: a3e6781b76ac72473b336e2a4b254870 (MD5) Previous issue date: 1961
-
The Effect of Construction Operations on Interests in Land
As construction materials are fixed to land or the structure of an existing building, they lose their identity as personal property and become part of the land itself. This basic proposition threatens to elevate the interest of the ultimate owner of the land, the freeholder, above the proprietors …
-
VITASCOPE: Extensible and Scalable 3D Visualization of Simulated Construction Operations
In the domain of operations design and analysis, the ability to see a 3D animation of processes that have been simulated allows for three very important things: 1) The developer of a simulation model can ascertain that there are no errors in the coding (Verification); 2) The experts, field …
-
The Use of Short-Interval GPS Data for Construction Operations Analysis
… correlations between performance times in construction operations and by using field data to verify the results obtained from productivity estimating tools. Use of the system was shown to improve knowledge and provide additional insight into operations analysis studies.
-
Automated Vision-Based Tracking and Action Recognition of Earthmoving Construction Operations
The current practice of construction productivity and emission monitoring is performed by either manual stopwatch studies which are significantly labor intensive and subject to human errors, or by the use of RFID and GPS tracking devices which may be costly and impractical. To address these …
-
Automated monitoring and systemic analysis of workers' safety behavior in construction operations
In construction, workforces are an essential element of safety management. Previous studies found that about 80%–90% of accidents are strongly associated with workers’ unsafe actions and errors, which are affected by safety-related factors (e.g., safety program, safety culture, production …
-
Vision-based workface assessment using depth images for activity analysis of interior construction operations
… determining the overall activity rates of onsite construction workers throughout a day– typically involves manual visual observations which are time-consuming and labor-intensive. To minimize subjectivity and the time required for conducting detailed assessments, and allowing managers to spend …
-
Robust bead width manipulation and control for military additive construction operations in expeditionary environments
Submission published under a 24 month embargo labeled 'Closed Access', the embargo will last until 2024-05-01
-
An integrated framework for sustainable construction processes: understanding and managing the environmental performance of construction operations
The environmental impact from construction activities has largely been underestimated, even though these processes constitute significant economic activity. They account for a substantial amount of Greenhouse Gases (GHGs) and other diesel emissions, such as nitrogen oxide (NOx) and particulate …
-
Automated 2D Detection and Localization of Construction Resources in Support of Automated Performance Assessment of Construction Operations
… based algorithms for automated 2D detection of construction workers and equipment from site video streams. The state-of-the-art research proposes semi-automated detection methods for tracking of construction workers and equipment. Considering the number of active equipment and workers on …
-
Develop a Lean project management framework for the construction companies in order to improve the time and cost efficiencies of their construction operations
… Lean project management framework for the Saudi construction firms in order to improve the time and cost efficiencies of their operations. It critically evaluates the applicability of Lean's philosophy in the construction industry. It also investigates the management implication of traditional …
-
A utilização de jogos no ensino da matemática como instrumentos de aprendizagem no 5º ano do ensino fundamental.
… intervention, through games, is positive, the construction operations with natural numbers. Participated in this study two groups of fifth grade of elementary school, a total of 28 children in the School Hall João Silvano. It was applied in the subjects in order to assess knowledge and …
-
Optimal Construction Site Layout Planning for Airport Expansion Projects
… to the advancement of current practice in construction site layout planning and can lead to: (1) increasing the efficiency of construction operations; (2) improving the level of construction safety; (3) reducing construction-related hazards to aviation safety; and (4) enhancing the security …
-
Construction crew design : a lean approach
… CREW DESIN: A LEAN APPROACHByNaveen NerwalConstruction work is executed by a variety of speciality trades, using group of workers commonly known as crews. Performance of these crews is very crucial to the work being executed and consequently for the overall project performance. Yet …
-
The Automated Laser Position System - ALPS
The construction industry needs an accurate real-time positioning system. Such a system, if successfully implemented, would lead to significant increases in the performance of many construction operations. This thesis presents the Automated Laser Position System (ALPS) for accurate real-time …