Back to search

Virginia Tech

The Appalachian Power Company Along the New River: The Defeat of the Blue Ridge Project in Historical Perspective

Abstract

dc:description.abstract

The Appalachian Power Company is an operating company of the American Electric Power Company, the largest electricity producing private electric system in the United States since 1953. The Appalachian Power Company held almost exclusive development rights along the New River since its 1911 charter. From then until the 1940s, it built a few small dams, a very large hydroelectric dam with the highest generating capacity of its time, and the largest steam plant in Virginia on the New River. Besides a few navigation issues, conflicting developments, and brief clashes with the federal government, seen in Chapter Two of this thesis, the Appalachian Power Company's developments along the New River went largely unchallenged until the late-1960s. The Blue Ridge Project was the utility's next large hydroelectric project on the New River. It was slated to impound the waters of the upper New River in Grayson County, Virginia, with two reservoirs extending into the river's headwaters in the counties of Ashe and Alleghany in northwestern North Carolina. Though the initial project met no serious opposition, environmental lawyers and the State of North Carolina defeated a considerably enlarged version of the proposal after a legal battle lasting over a decade. Why was this double impoundment not successfully constructed? What had changed in the last decades to influence Appalachian Power's previously unchallenged right to generate electricity along the New River? The purpose of this thesis is to answer these questions.

Degree

thesis:*
Name thesis:degree_name
Master of Arts
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
History
Department dc:contributor.department
History
Grantor dc:publisher
Virginia Tech
Year dc:date.issued
2006

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Woodard, Robert Seth
Chair dc:contributor.committeechair
  • Barrow, Mark V. Jr.
Committee members dc:contributor.committeemember
  • Fine, Elizabeth C.
  • Hirsh, Richard F.

Subjects

dc:subject × 6

Rights

dc:rights
Statement dc:rights
  • In Copyright

Identifiers

dc:identifier.*
Dc Identifier Other
etd-05252006-153954
OAI identifier oai:identifier
oai:vtechworks.lib.vt.edu:10919/33226

Chain of custody

source
Harvested from
Virginia Tech
Base URL
vtechworks.lib.vt.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Woodard, Robert Seth. The Appalachian Power Company Along the New River: The Defeat of the Blue Ridge Project in Historical Perspective. masters thesis, Virginia Tech, 2006. http://hdl.handle.net/10919/33226