{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/33226"},"canonical_url":"https://search.dev.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/33226","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"The Appalachian Power Company Along the New River: The Defeat of the Blue Ridge Project in Historical Perspective","abstract":"The Appalachian Power Company is an operating company of the American Electric Power Company, the largest electricity producing private electric system in the United States since 1953. The Appalachian Power Company held almost exclusive development rights along the New River since its 1911 charter. From then until the 1940s, it built a few small dams, a very large hydroelectric dam with the highest generating capacity of its time, and the largest steam plant in Virginia on the New River. Besides a few navigation issues, conflicting developments, and brief clashes with the federal government, seen in Chapter Two of this thesis, the Appalachian Power Company's developments along the New River went largely unchallenged until the late-1960s. The Blue Ridge Project was the utility's next large hydroelectric project on the New River. It was slated to impound the waters of the upper New River in Grayson County, Virginia, with two reservoirs extending into the river's headwaters in the counties of Ashe and Alleghany in northwestern North Carolina. Though the initial project met no serious opposition, environmental lawyers and the State of North Carolina defeated a considerably enlarged version of the proposal after a legal battle lasting over a decade. Why was this double impoundment not successfully constructed? What had changed in the last decades to influence Appalachian Power's previously unchallenged right to generate electricity along the New River? The purpose of this thesis is to answer these questions.","abstract_html":"The Appalachian Power Company is an operating company of the American Electric Power Company, the largest electricity producing private electric system in the United States since 1953. The Appalachian Power Company held almost exclusive development rights along the New River since its 1911 charter. From then until the 1940s, it built a few small dams, a very large hydroelectric dam with the highest generating capacity of its time, and the largest steam plant in Virginia on the New River. Besides a few navigation issues, conflicting developments, and brief clashes with the federal government, seen in Chapter Two of this thesis, the Appalachian Power Company&#x27;s developments along the New River went largely unchallenged until the late-1960s. The Blue Ridge Project was the utility&#x27;s next large hydroelectric project on the New River. It was slated to impound the waters of the upper New River in Grayson County, Virginia, with two reservoirs extending into the river&#x27;s headwaters in the counties of Ashe and Alleghany in northwestern North Carolina. Though the initial project met no serious opposition, environmental lawyers and the State of North Carolina defeated a considerably enlarged version of the proposal after a legal battle lasting over a decade. Why was this double impoundment not successfully constructed? What had changed in the last decades to influence Appalachian Power&#x27;s previously unchallenged right to generate electricity along the New River? The purpose of this thesis is to answer these questions.","abstract_has_math":false,"creators":["Woodard, Robert Seth"],"institution":"Virginia Tech","degree_name":"Master of Arts","degree_level":"masters","degree_discipline":"History","degree_department":"History","school":null,"contributors":[],"advisors":[],"committee_chairs":["Barrow, Mark V. Jr."],"committee_members":["Fine, Elizabeth C.","Hirsh, Richard F."],"year":2006,"date_issued":"2006-05-11","date_published":"2006-05-11","updated_at":"2026-07-22T22:18:41Z","subjects":["New River Valley","Appalachian Power Company","New River","Dams","Environmental Movement","Blue Ridge Project"],"languages":[],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-05252006-153954"],"render_values":[{"text":"etd-05252006-153954","href":null,"code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/10919/33226","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["Barrow, Mark V. Jr."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Fine, Elizabeth C.","Hirsh, Richard F."]},{"key":"dc:contributor.department","label":"Department","values":["History"]},{"key":"dc:creator","label":"Author","values":["Woodard, Robert Seth"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-14T20:38:34Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-14T20:38:34Z","2006-07-13"]},{"key":"dc:date.issued","label":"Date","values":["2006-05-11"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Tech"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["History"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Arts"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["New River Valley","Appalachian Power Company","New River","Dams","Environmental Movement","Blue Ridge Project"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-05252006-153954"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/33226"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Appalachian Power Company is an operating company of the American Electric Power Company, the largest electricity producing private electric system in the United States since 1953. The Appalachian Power Company held almost exclusive development rights along the New River since its 1911 charter. From then until the 1940s, it built a few small dams, a very large hydroelectric dam with the highest generating capacity of its time, and the largest steam plant in Virginia on the New River. Besides a few navigation issues, conflicting developments, and brief clashes with the federal government, seen in Chapter Two of this thesis, the Appalachian Power Company's developments along the New River went largely unchallenged until the late-1960s. The Blue Ridge Project was the utility's next large hydroelectric project on the New River. It was slated to impound the waters of the upper New River in Grayson County, Virginia, with two reservoirs extending into the river's headwaters in the counties of Ashe and Alleghany in northwestern North Carolina. Though the initial project met no serious opposition, environmental lawyers and the State of North Carolina defeated a considerably enlarged version of the proposal after a legal battle lasting over a decade. Why was this double impoundment not successfully constructed? What had changed in the last decades to influence Appalachian Power's previously unchallenged right to generate electricity along the New River? The purpose of this thesis is to answer these questions."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Arts"]},{"key":"dc:title","label":"Title","values":["The Appalachian Power Company Along the New River: The Defeat of the Blue Ridge Project in Historical Perspective"]}]}],"canonical_facts":{"dc:contributor.committeechair":["Barrow, Mark V. Jr."],"dc:contributor.committeemember":["Fine, Elizabeth C.","Hirsh, Richard F."],"dc:contributor.department":["History"],"dc:creator":["Woodard, Robert Seth"],"dc:date.accessioned":["2014-03-14T20:38:34Z"],"dc:date.available":["2014-03-14T20:38:34Z","2006-07-13"],"dc:date.issued":["2006-05-11"],"dc:description.abstract":["The Appalachian Power Company is an operating company of the American Electric Power Company, the largest electricity producing private electric system in the United States since 1953. The Appalachian Power Company held almost exclusive development rights along the New River since its 1911 charter. From then until the 1940s, it built a few small dams, a very large hydroelectric dam with the highest generating capacity of its time, and the largest steam plant in Virginia on the New River. Besides a few navigation issues, conflicting developments, and brief clashes with the federal government, seen in Chapter Two of this thesis, the Appalachian Power Company's developments along the New River went largely unchallenged until the late-1960s. The Blue Ridge Project was the utility's next large hydroelectric project on the New River. It was slated to impound the waters of the upper New River in Grayson County, Virginia, with two reservoirs extending into the river's headwaters in the counties of Ashe and Alleghany in northwestern North Carolina. Though the initial project met no serious opposition, environmental lawyers and the State of North Carolina defeated a considerably enlarged version of the proposal after a legal battle lasting over a decade. Why was this double impoundment not successfully constructed? What had changed in the last decades to influence Appalachian Power's previously unchallenged right to generate electricity along the New River? The purpose of this thesis is to answer these questions."],"dc:description.degree":["Master of Arts"],"dc:identifier.other":["etd-05252006-153954"],"dc:identifier.uri":["http://hdl.handle.net/10919/33226"],"dc:publisher":["Virginia Tech"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject":["New River Valley","Appalachian Power Company","New River","Dams","Environmental Movement","Blue Ridge Project"],"dc:title":["The Appalachian Power Company Along the New River: The Defeat of the Blue Ridge Project in Historical Perspective"],"dc:type":["Thesis"],"thesis:degree_discipline":["History"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Arts"],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-07-22T22:18:41Z"}