Back to results

University of Wolverhampton

The development of 5D BIM framework to facilitate costing in contractor-led projects

Abstract

dc:description.abstract

Building Information Modelling (BIM) as an ambitious Government Construction Strategy (GCS) on all publicly procured sector projects, is leading to a significant shift and changing the dynamics of cost professional functions. This therefore requires the current fragmented construction industry to urgently review approaches to existing cost estimating and cost planning processes leading to a reliable project budget. This drive, along with 2025 construction strategy is key to achieving the requirement of GCS for 25 percent cost reduction. To successfully implement Level 2 BIM, relevant costing framework, enabling 5D BIM cost protocol or standard significant to changing dynamics of cost functions within BIM environment is required to be embedded within design development stages. Using phenomenological qualitative research method and thematic data analytical process, interviews involving 21 participants from seven construction organisations with design, construction and cost management practices were conducted. Scope was intentionally provided for extensive discussion to identify issues beyond the literature findings. Findings suggest strong commitment and leadership from organisational management will facilitate cost savings, generate accurate cost information in a Level 2 BIM project. A considerable cultural shift towards automating and digitising cost functions virtually; stronger collaborative working relationship relative to costing in design development, construction practice, maintenance and operation is required across the built environment. The 5D BIM Costing Framework (5B-CF) which informed the creation of 5D BIM Cost Protocol (5B-CP) as developed would allow contractors fully utilise BIM facilitating more effective 5D costing in a contractor-led project.

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Tochukwu, Moses Gift

Subjects

dc:subject × 10

Rights

dc:rights
Statement dc:rights
  • Attribution-NonCommercial-NoDerivs 3.0 United States

Chain of custody

source
Harvested from
University of Wolverhampton
Base URL
wlv.openrepository.com/server/oai/request
Last updated
2026-07-24
Source record
OAI-PMH GetRecord
citation

Tochukwu, Moses Gift. The development of 5D BIM framework to facilitate costing in contractor-led projects. 2018.