Back to results

Virginia Tech

Identifying the Economic Barriers to CLT Cost Estimation Among Building Construction Professionals

Abstract

dc:description.abstract

Cross-laminated timbers (CLTs) are strong and lightweight structural building materials. CLTs are made from renewable wood resources and have significant economic potential as a new value-added product for the United States. However, market penetration has been obstructed by product affordability and lack of availability for use. Previous studies and projects have surveyed opinions of designers and contractors about the adoption of CLTs. No previous study was found that surveyed cost estimators, who serve the essential function of creating economic comparisons of alternative materials in commercial construction. CLTs are not included in these current cost estimation tools and software packages which may be limiting the potential use of CLT in construction. The purpose of this study was to discover if cost estimation is being used to make structural decisions potentially affecting the marketability of CLT use in construction and building design because of the ability to estimate CLTs adequately. Through the use of a survey, the re-designing of a building, and discussions with subject matter experts, this study examined the knowledge level of cross-laminated timbers of under-surveyed building construction professions and the relationship between cost estimation and structural material choices. Their responses are demonstrating the need for better cost estimation tools for cross-laminated timbers such as inclusion in the Construction Specifications Institute's classification systems in order for CLTs to become a more competitive product. The study concluded that cost estimation is important for CLT market development, because it is being used extensively in the construction industry.

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
Forest Products
Department dc:contributor.department
Forest Resources and Environmental Conservation
Grantor dc:publisher
Virginia Tech
Year dc:date.issued
2020

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Stutesman, Jonathan Harley
Chair dc:contributor.committeechair
  • Hindman, Daniel P.
Committee members dc:contributor.committeemember
  • Hammett, A. L. (Tom)
  • Mills, Thomas H.
  • Edge, Kay F.
  • Becker, Edward Gentry

Subjects

dc:subject × 3

Rights

dc:rights
Statement dc:rights
  • In Copyright

Identifiers

dc:identifier.*
Dc Identifier Other
vt_gsexam:20655
OAI identifier oai:identifier
oai:vtechworks.lib.vt.edu:10919/96712

Chain of custody

source
Harvested from
Virginia Tech
Base URL
vtechworks.lib.vt.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Stutesman, Jonathan Harley. Identifying the Economic Barriers to CLT Cost Estimation Among Building Construction Professionals. masters thesis, Virginia Tech, 2020. http://hdl.handle.net/10919/96712