{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/90920"},"canonical_url":"https://search.dev.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/90920","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"An integrated computer simulator for surface mine planning and design","abstract":"In the increasingly competitive coal market, it is becoming more important for coal operators to develop mathematical models for surface mining which can estimate mining costs before the actual mining begins. The problem becomes even more acute with the new reclamation laws, as they affect surface coal mining methods, productivity, and costs. This study presents a computer simulator for a mountaintop removal type of surface mining operation. It will permit users to compare the costs associated with different overburden handling and reclamation plans. It may be used to minimize productivity losses, and, perhaps, to increase productivity and consequently to reduce operating costs through design and implementation of modified mountain top removal methods.","abstract_html":"In the increasingly competitive coal market, it is becoming more important for coal operators to develop mathematical models for surface mining which can estimate mining costs before the actual mining begins. The problem becomes even more acute with the new reclamation laws, as they affect surface coal mining methods, productivity, and costs. This study presents a computer simulator for a mountaintop removal type of surface mining operation. It will permit users to compare the costs associated with different overburden handling and reclamation plans. It may be used to minimize productivity losses, and, perhaps, to increase productivity and consequently to reduce operating costs through design and implementation of modified mountain top removal methods.","abstract_has_math":false,"creators":["Chakraborty, Amal"],"institution":"Virginia Polytechnic Institute and State University","degree_name":"M.S.","degree_level":"masters","degree_discipline":"Mining Engineering","degree_department":"Mining Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1985,"date_issued":"1985","date_published":"1985","updated_at":"2026-07-22T22:19:09Z","subjects":[],"languages":["en_US"],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/10919/90920","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.department","label":"Department","values":["Mining Engineering"]},{"key":"dc:creator","label":"Author","values":["Chakraborty, Amal"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2019-07-03T16:42:34Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2019-07-03T16:42:34Z"]},{"key":"dc:date.issued","label":"Date","values":["1985"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Polytechnic Institute and State University"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.dcmitype","label":"Dc Type Dcmitype","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Mining Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]},{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/90920"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["In the increasingly competitive coal market, it is becoming more important for coal operators to develop mathematical models for surface mining which can estimate mining costs before the actual mining begins. The problem becomes even more acute with the new reclamation laws, as they affect surface coal mining methods, productivity, and costs. This study presents a computer simulator for a mountaintop removal type of surface mining operation. It will permit users to compare the costs associated with different overburden handling and reclamation plans. It may be used to minimize productivity losses, and, perhaps, to increase productivity and consequently to reduce operating costs through design and implementation of modified mountain top removal methods."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.S."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["An integrated computer simulator for surface mine planning and design"]}]}],"canonical_facts":{"dc:contributor.department":["Mining Engineering"],"dc:creator":["Chakraborty, Amal"],"dc:date.accessioned":["2019-07-03T16:42:34Z"],"dc:date.available":["2019-07-03T16:42:34Z"],"dc:date.issued":["1985"],"dc:description.abstract":["In the increasingly competitive coal market, it is becoming more important for coal operators to develop mathematical models for surface mining which can estimate mining costs before the actual mining begins. The problem becomes even more acute with the new reclamation laws, as they affect surface coal mining methods, productivity, and costs. This study presents a computer simulator for a mountaintop removal type of surface mining operation. It will permit users to compare the costs associated with different overburden handling and reclamation plans. It may be used to minimize productivity losses, and, perhaps, to increase productivity and consequently to reduce operating costs through design and implementation of modified mountain top removal methods."],"dc:description.degree":["M.S."],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/10919/90920"],"dc:language.iso":["en_US"],"dc:publisher":["Virginia Polytechnic Institute and State University"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:title":["An integrated computer simulator for surface mine planning and design"],"dc:type":["Thesis"],"dc:type.dcmitype":["Text"],"thesis:degree_discipline":["Mining Engineering"],"thesis:degree_level":["masters"],"thesis:degree_name":["M.S."],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-07-22T22:19:09Z"}