Abstract
dc:description.abstractModern construction projects are delivered in complex, fast pace environments. Stakeholders are required to participate in dynamic project settings with resource constraints, information constraints, and time constraints. To overcome gaps in knowledge, to deliver decisions quickly, and to overcome human limits in cognitive ability, decision makers typically employ heuristics, or rules of thumb to arrive at relatively quick answers. Heuristics are cognitive shortcuts that an individual employs to arrive at quick decisions (Goodwin et al., 2004). These heuristics are used in a variety of ways, ranging from using the process of elimination (elimination heuristic) to applying different cognitive weights to options based on recent experience, reputation, or familiarity (Shah and Oppenheimer, 2008). This research aims to identify heuristics present in the implementation phase of construction. By summarizing the results of two studies conducted with a Mid-Atlantic Contractor, this thesis prescribes seven heuristics commonly used by construction stakeholders.
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Level thesis:degree_level
- masters
- Discipline thesis:degree_discipline
- Civil Engineering
- Department dc:contributor.department
- Civil and Environmental Engineering
- Grantor dc:publisher
- Virginia Tech
- Year dc:date.issued
- 2019
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Sprinkle, Zachary Joseph
- Chair dc:contributor.committeechair
-
- Shealy, Earl W.
- Committee members dc:contributor.committeemember
-
- Garvin, Michael J.
- Iorio, Josh
Subjects
dc:subject × 5Rights
dc:rights- Statement dc:rights
-
- In Copyright
- Licence dc:rights.uri
Identifiers
dc:identifier.*- Dc Identifier Other
- vt_gsexam:18709
- OAI identifier oai:identifier
- oai:vtechworks.lib.vt.edu:10919/87089