Back to results

Virginia Tech

The Use of Central Tendency Measures from an Operational Short Lead-time Hydrologic Ensemble Forecast System for Real-time Forecasts

Abstract

dc:description.abstract

A principal factor contributing to hydrologic prediction uncertainty is modeling error intro- duced by the measurement and prediction of precipitation. The research presented demon- strates the necessity for using probabilistic methods to quantify hydrologic forecast uncer- tainty due to the magnitude of precipitation errors. Significant improvements have been made in precipitation estimation that have lead to greatly improved hydrologic simulations. However, advancements in the prediction of future precipitation have been marginal. This research shows that gains in forecasted precipitation accuracy have not significantly improved hydrologic forecasting accuracy. The use of forecasted precipitation, referred to as quantita- tive precipitation forecast (QPF), in hydrologic forecasting remains commonplace. Non-zero QPF is shown to improve hydrologic forecasts, but QPF duration should be limited to 6 to 12 hours for flood forecasting, particularly for fast responding watersheds. Probabilistic hydrologic forecasting captures hydrologic forecast error introduced by QPF for all forecast durations. However, public acceptance of probabilistic hydrologic forecasts is problematic. Central tendency measures from a probabilistic hydrologic forecast, such as the ensemble median or mean, have the appearance of a single-valued deterministic forecast. The research presented shows that hydrologic ensemble median and mean forecasts of river stage have smaller forecast errors than current operational methods with forecast lead-time beginning at 36-hours for fast response basins. Overall, hydrologic ensemble median and mean forecasts display smaller forecast error than current operational forecasts.

Degree

thesis:*
Name thesis:degree_name
Ph. D.
Level thesis:degree_level
doctoral
Discipline thesis:degree_discipline
Civil Engineering
Department dc:contributor.department
Civil and Environmental Engineering
Grantor dc:publisher
Virginia Tech
Year dc:date.issued
2018

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Adams, Thomas Edwin III
Chair dc:contributor.committeechair
  • Dymond, Randel L.
Committee members dc:contributor.committeemember
  • McGuire, Kevin J.
  • Widdowson, Mark A.
  • Ellis, Andrew

Subjects

dc:subject × 6

Rights

dc:rights
Statement dc:rights
  • In Copyright

Identifiers

dc:identifier.*
Dc Identifier Other
vt_gsexam:16311
OAI identifier oai:identifier
oai:vtechworks.lib.vt.edu:10919/83461

Chain of custody

source
Harvested from
Virginia Tech
Base URL
vtechworks.lib.vt.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Adams, Thomas Edwin III. The Use of Central Tendency Measures from an Operational Short Lead-time Hydrologic Ensemble Forecast System for Real-time Forecasts. doctoral thesis, Virginia Tech, 2018. http://hdl.handle.net/10919/83461