{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/78138"},"canonical_url":"https://search.dev.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/78138","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"Working in Harmony: The Impact of Personality on the Short- and Long-Run Dynamics of Team Cohesion","abstract":"Team cohesion represents arguably the most studied team construct as it has been consistently shown to be associated with improved performance. However, although cohesion is now understood to be an emergent state—as it develops over a team's life cycle—research has yet to uncover the dynamic nature of cohesion. The current study was designed to particularly test the impact of team personality composition both on the initial status of cohesion, and on changes in cohesion over time. 80 newly formed teams performed a highly interdependent team task, and team cohesion was measured over six time points. Personality was measured prior to the task and calculated at the team level, as both an average and a variability score. After performing longitudinal hierarchical linear modeling, results indicated that team personality impacts cohesion differently at initial status and over time. In particular, higher team agreeableness predicted greater slopes of cohesion, but not initial cohesion levels. Also, higher extraversion predicted greater initial status of cohesion, but not greater slopes. These results present important boundary conditions for understanding the role of team personality composition on team cohesion.","abstract_html":"Team cohesion represents arguably the most studied team construct as it has been consistently shown to be associated with improved performance. However, although cohesion is now understood to be an emergent state—as it develops over a team&#x27;s life cycle—research has yet to uncover the dynamic nature of cohesion. The current study was designed to particularly test the impact of team personality composition both on the initial status of cohesion, and on changes in cohesion over time. 80 newly formed teams performed a highly interdependent team task, and team cohesion was measured over six time points. Personality was measured prior to the task and calculated at the team level, as both an average and a variability score. After performing longitudinal hierarchical linear modeling, results indicated that team personality impacts cohesion differently at initial status and over time. In particular, higher team agreeableness predicted greater slopes of cohesion, but not initial cohesion levels. Also, higher extraversion predicted greater initial status of cohesion, but not greater slopes. These results present important boundary conditions for understanding the role of team personality composition on team cohesion.","abstract_has_math":false,"creators":["Acton, Bryan Patrick"],"institution":"Virginia Tech","degree_name":"Master of Science","degree_level":"masters","degree_discipline":"Psychology","degree_department":"Psychology","school":null,"contributors":[],"advisors":[],"committee_chairs":["Foti, Roseanne J."],"committee_members":["Braun, Michael T.","Beal, Daniel J."],"year":2016,"date_issued":"2016-05-09","date_published":"2016-05-09","updated_at":"2026-07-22T22:20:27Z","subjects":["Longitudinal","Team Composition","Emergence","Teams","Multilevel Modeling"],"languages":["en_US"],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-05232016-233229"],"render_values":[{"text":"etd-05232016-233229","href":null,"code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/10919/78138","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["Foti, Roseanne J."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Braun, Michael T.","Beal, Daniel J."]},{"key":"dc:contributor.department","label":"Department","values":["Psychology"]},{"key":"dc:creator","label":"Author","values":["Acton, Bryan Patrick"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2017-06-13T19:44:13Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2017-06-13T19:44:13Z","2016-07-01"]},{"key":"dc:date.issued","label":"Date","values":["2016-05-09"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Tech"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.dcmitype","label":"Dc Type Dcmitype","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Psychology"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Longitudinal","Team Composition","Emergence","Teams","Multilevel Modeling"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]},{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-05232016-233229"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/78138"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Team cohesion represents arguably the most studied team construct as it has been consistently shown to be associated with improved performance. However, although cohesion is now understood to be an emergent state—as it develops over a team's life cycle—research has yet to uncover the dynamic nature of cohesion. The current study was designed to particularly test the impact of team personality composition both on the initial status of cohesion, and on changes in cohesion over time. 80 newly formed teams performed a highly interdependent team task, and team cohesion was measured over six time points. Personality was measured prior to the task and calculated at the team level, as both an average and a variability score. After performing longitudinal hierarchical linear modeling, results indicated that team personality impacts cohesion differently at initial status and over time. In particular, higher team agreeableness predicted greater slopes of cohesion, but not initial cohesion levels. Also, higher extraversion predicted greater initial status of cohesion, but not greater slopes. These results present important boundary conditions for understanding the role of team personality composition on team cohesion."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Science"]},{"key":"dc:title","label":"Title","values":["Working in Harmony: The Impact of Personality on the Short- and Long-Run Dynamics of Team Cohesion"]}]}],"canonical_facts":{"dc:contributor.committeechair":["Foti, Roseanne J."],"dc:contributor.committeemember":["Braun, Michael T.","Beal, Daniel J."],"dc:contributor.department":["Psychology"],"dc:creator":["Acton, Bryan Patrick"],"dc:date.accessioned":["2017-06-13T19:44:13Z"],"dc:date.available":["2017-06-13T19:44:13Z","2016-07-01"],"dc:date.issued":["2016-05-09"],"dc:description.abstract":["Team cohesion represents arguably the most studied team construct as it has been consistently shown to be associated with improved performance. However, although cohesion is now understood to be an emergent state—as it develops over a team's life cycle—research has yet to uncover the dynamic nature of cohesion. The current study was designed to particularly test the impact of team personality composition both on the initial status of cohesion, and on changes in cohesion over time. 80 newly formed teams performed a highly interdependent team task, and team cohesion was measured over six time points. Personality was measured prior to the task and calculated at the team level, as both an average and a variability score. After performing longitudinal hierarchical linear modeling, results indicated that team personality impacts cohesion differently at initial status and over time. In particular, higher team agreeableness predicted greater slopes of cohesion, but not initial cohesion levels. Also, higher extraversion predicted greater initial status of cohesion, but not greater slopes. These results present important boundary conditions for understanding the role of team personality composition on team cohesion."],"dc:description.degree":["Master of Science"],"dc:identifier.other":["etd-05232016-233229"],"dc:identifier.uri":["http://hdl.handle.net/10919/78138"],"dc:language.iso":["en_US"],"dc:publisher":["Virginia Tech"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject":["Longitudinal","Team Composition","Emergence","Teams","Multilevel Modeling"],"dc:title":["Working in Harmony: The Impact of Personality on the Short- and Long-Run Dynamics of Team Cohesion"],"dc:type":["Thesis"],"dc:type.dcmitype":["Text"],"thesis:degree_discipline":["Psychology"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-07-22T22:20:27Z"}