Back to results

Virginia Tech

Hydrologic Modeling of a Probable Maximum Precipitation Event Using HEC-HMS and GIS Models - A Case Study of Two Watersheds in Southern Virginia-

Abstract

dc:description.abstract

Presented in this thesis is a case study of two study watersheds located in south central Virginia. For each, a HEC-HMS event-based hydrologic model was constructed to simulate the rainfall-runoff response from the Probable Maximum Storm (PMS), the theoretical worst-case meteorological event that is capable of occurring over a particular region. The primary goal of these simulations was to obtain discharge hydrographs associated with the Probable Maximum Flood (PMF) at key locations in each of the watersheds. These hydrographs were subsequently used to develop flood inundation maps of the study areas and to characterize sediment transport phenomena in the study reaches under severe flooding conditions. To build the hydrologic basin models, ArcHydro, HEC-GeoHMS and ArcGIS were employed to assimilate the substantial amount of input data and to extract the pertinent modeling parameters required for the selected simulation methods. In this, the SCS Loss and Transform Methods, along with the Muskingum Routing Method, were adopted for the HEC-HMS simulations. Once completed, the basin models were calibrated through a comparison of simulated design storm flows to frequency discharge estimates obtained with regional regression techniques and a flood frequency analysis. The models were then used to simulate their respective PMS events, which were developed following recommendations from the Hydrometeorological Branch of the National Weather Service and the U.S. Army Corps of Engineers. Descriptions of each of the study sites, explanations of the modeling theory and development methodologies, and discussions of the modeling results are all detailed within.

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
Civil Engineering
Department dc:contributor.department
Civil Engineering
Grantor dc:publisher
Virginia Tech
Year dc:date.issued
2012

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Kingston, William John III
Chair dc:contributor.committeechair
  • Diplas, Panayiotis
Committee members dc:contributor.committeemember
  • Bodnar, Robert J.
  • Moglen, Glenn E.

Subjects

dc:subject × 5

Rights

dc:rights
Statement dc:rights
  • In Copyright
Language dc:language.iso
en_US

Identifiers

dc:identifier.*
Dc Identifier Other
etd-07022012-185139
OAI identifier oai:identifier
oai:vtechworks.lib.vt.edu:10919/76812

Chain of custody

source
Harvested from
Virginia Tech
Base URL
vtechworks.lib.vt.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Kingston, William John III. Hydrologic Modeling of a Probable Maximum Precipitation Event Using HEC-HMS and GIS Models - A Case Study of Two Watersheds in Southern Virginia-. masters thesis, Virginia Tech, 2012. http://hdl.handle.net/10919/76812