{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/76240"},"canonical_url":"https://search.dev.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/76240","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"Encumbered space and its effect on mine transportation","abstract":"The concept of encumbered space is recognized and defined. The components and their subcomponents are identified and isolated. The relative interactions between them are noted. Initial families of velocity-clearance curves for several haulage media are derived, noting the vital need for future research. The basic assumption that production is proportional to the product of capacity and velocity is utilized and the concept of derating the maximum theoretical production rate of an underground mining situation to obtain a more realistic estimate of the actual production rate is introduced. An example of the use of derating factors (derived from the results of questionnaires) in obtaining an estimate of production is presented. An order of magnitude check is made on the weighting of the initially selected derating factors. Results proved to be consistent, confirming the approach. Recommendations for future research are made.","abstract_html":"The concept of encumbered space is recognized and defined. The components and their subcomponents are identified and isolated. The relative interactions between them are noted. Initial families of velocity-clearance curves for several haulage media are derived, noting the vital need for future research. The basic assumption that production is proportional to the product of capacity and velocity is utilized and the concept of derating the maximum theoretical production rate of an underground mining situation to obtain a more realistic estimate of the actual production rate is introduced. An example of the use of derating factors (derived from the results of questionnaires) in obtaining an estimate of production is presented. An order of magnitude check is made on the weighting of the initially selected derating factors. Results proved to be consistent, confirming the approach. Recommendations for future research are made.","abstract_has_math":false,"creators":["Lineberry, G. T."],"institution":"Virginia Polytechnic Institute and State University","degree_name":"Master of Science","degree_level":"masters","degree_discipline":"Mining and Minerals Engineering","degree_department":"Mining and Minerals Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1979,"date_issued":"1979","date_published":"1979","updated_at":"2026-07-22T22:19:03Z","subjects":[],"languages":["en_US"],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/10919/76240","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.department","label":"Department","values":["Mining and Minerals Engineering"]},{"key":"dc:creator","label":"Author","values":["Lineberry, G. T."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2017-03-10T20:13:37Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2017-03-10T20:13:37Z"]},{"key":"dc:date.issued","label":"Date","values":["1979"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Polytechnic Institute and State University"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.dcmitype","label":"Dc Type Dcmitype","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Mining and Minerals Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]},{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/76240"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The concept of encumbered space is recognized and defined. The components and their subcomponents are identified and isolated. The relative interactions between them are noted. Initial families of velocity-clearance curves for several haulage media are derived, noting the vital need for future research. The basic assumption that production is proportional to the product of capacity and velocity is utilized and the concept of derating the maximum theoretical production rate of an underground mining situation to obtain a more realistic estimate of the actual production rate is introduced. An example of the use of derating factors (derived from the results of questionnaires) in obtaining an estimate of production is presented. An order of magnitude check is made on the weighting of the initially selected derating factors. Results proved to be consistent, confirming the approach. Recommendations for future research are made."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Science"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Encumbered space and its effect on mine transportation"]}]}],"canonical_facts":{"dc:contributor.department":["Mining and Minerals Engineering"],"dc:creator":["Lineberry, G. T."],"dc:date.accessioned":["2017-03-10T20:13:37Z"],"dc:date.available":["2017-03-10T20:13:37Z"],"dc:date.issued":["1979"],"dc:description.abstract":["The concept of encumbered space is recognized and defined. The components and their subcomponents are identified and isolated. The relative interactions between them are noted. Initial families of velocity-clearance curves for several haulage media are derived, noting the vital need for future research. The basic assumption that production is proportional to the product of capacity and velocity is utilized and the concept of derating the maximum theoretical production rate of an underground mining situation to obtain a more realistic estimate of the actual production rate is introduced. An example of the use of derating factors (derived from the results of questionnaires) in obtaining an estimate of production is presented. An order of magnitude check is made on the weighting of the initially selected derating factors. Results proved to be consistent, confirming the approach. Recommendations for future research are made."],"dc:description.degree":["Master of Science"],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/10919/76240"],"dc:language.iso":["en_US"],"dc:publisher":["Virginia Polytechnic Institute and State University"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:title":["Encumbered space and its effect on mine transportation"],"dc:type":["Thesis"],"dc:type.dcmitype":["Text"],"thesis:degree_discipline":["Mining and Minerals Engineering"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-07-22T22:19:03Z"}