{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/71829"},"canonical_url":"https://search.dev.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/71829","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"Phasor Measurement Units Applications Prioritization Based on Wide-Area Disturbance Events","abstract":"Synchrophasor Measurement Units (PMUs) are devices that can not only measure but also time stamp voltage, current, frequency, among others. PMUs take these synchronized measurements as fast as 60 times per second; compared with the traditional 2-4 second SCADA measurements, PMUs bring a much clear and real-time picture of what is happening in the power system. PMUs have been increasingly deployed across transmission power grids worldwide. In the USA this is primarily done by utilities through projects sponsored mainly by SIGS and Smart Grid grants. There are different applications that synchrophasors can provide, including off-line and real-time applications. However, due to budget constraints, technology development and characteristics specific to each system, not all applications are equally suitable and essential for all electric power systems. This thesis provides a method for PMU applications prioritization based on the analysis and results of wide area disturbance events.","abstract_html":"Synchrophasor Measurement Units (PMUs) are devices that can not only measure but also time stamp voltage, current, frequency, among others. PMUs take these synchronized measurements as fast as 60 times per second; compared with the traditional 2-4 second SCADA measurements, PMUs bring a much clear and real-time picture of what is happening in the power system. PMUs have been increasingly deployed across transmission power grids worldwide. In the USA this is primarily done by utilities through projects sponsored mainly by SIGS and Smart Grid grants. There are different applications that synchrophasors can provide, including off-line and real-time applications. However, due to budget constraints, technology development and characteristics specific to each system, not all applications are equally suitable and essential for all electric power systems. This thesis provides a method for PMU applications prioritization based on the analysis and results of wide area disturbance events.","abstract_has_math":false,"creators":["Zora, Leydi Tatiana"],"institution":"Virginia Tech","degree_name":"Master of Science","degree_level":"masters","degree_discipline":"Electrical Engineering","degree_department":"Electrical and Computer Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":["De La Ree, Jaime"],"committee_members":["Centeno, Virgilio A.","Phadke, Arun G."],"year":2015,"date_issued":"2015-01-31","date_published":"2015-01-31","updated_at":"2026-07-22T22:19:21Z","subjects":["Synchrophasor","Phasor measurement unit","prioritization","non-quantifiable criteria"],"languages":[],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["vt_gsexam:4409"],"render_values":[{"text":"vt_gsexam:4409","href":null,"code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/10919/71829","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["De La Ree, Jaime"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Centeno, Virgilio A.","Phadke, Arun G."]},{"key":"dc:contributor.department","label":"Department","values":["Electrical and Computer Engineering"]},{"key":"dc:creator","label":"Author","values":["Zora, Leydi Tatiana"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2016-07-25T06:00:20Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2016-07-25T06:00:20Z"]},{"key":"dc:date.issued","label":"Date","values":["2015-01-31"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Tech"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Electrical Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Synchrophasor","Phasor measurement unit","prioritization","non-quantifiable criteria"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["vt_gsexam:4409"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/71829"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Synchrophasor Measurement Units (PMUs) are devices that can not only measure but also time stamp voltage, current, frequency, among others. PMUs take these synchronized measurements as fast as 60 times per second; compared with the traditional 2-4 second SCADA measurements, PMUs bring a much clear and real-time picture of what is happening in the power system. PMUs have been increasingly deployed across transmission power grids worldwide. In the USA this is primarily done by utilities through projects sponsored mainly by SIGS and Smart Grid grants. There are different applications that synchrophasors can provide, including off-line and real-time applications. However, due to budget constraints, technology development and characteristics specific to each system, not all applications are equally suitable and essential for all electric power systems. This thesis provides a method for PMU applications prioritization based on the analysis and results of wide area disturbance events."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Science"]},{"key":"dc:format.medium","label":"Dc Format Medium","values":["ETD"]},{"key":"dc:title","label":"Title","values":["Phasor Measurement Units Applications Prioritization Based on Wide-Area Disturbance Events"]}]}],"canonical_facts":{"dc:contributor.committeechair":["De La Ree, Jaime"],"dc:contributor.committeemember":["Centeno, Virgilio A.","Phadke, Arun G."],"dc:contributor.department":["Electrical and Computer Engineering"],"dc:creator":["Zora, Leydi Tatiana"],"dc:date.accessioned":["2016-07-25T06:00:20Z"],"dc:date.available":["2016-07-25T06:00:20Z"],"dc:date.issued":["2015-01-31"],"dc:description.abstract":["Synchrophasor Measurement Units (PMUs) are devices that can not only measure but also time stamp voltage, current, frequency, among others. PMUs take these synchronized measurements as fast as 60 times per second; compared with the traditional 2-4 second SCADA measurements, PMUs bring a much clear and real-time picture of what is happening in the power system. PMUs have been increasingly deployed across transmission power grids worldwide. In the USA this is primarily done by utilities through projects sponsored mainly by SIGS and Smart Grid grants. There are different applications that synchrophasors can provide, including off-line and real-time applications. However, due to budget constraints, technology development and characteristics specific to each system, not all applications are equally suitable and essential for all electric power systems. This thesis provides a method for PMU applications prioritization based on the analysis and results of wide area disturbance events."],"dc:description.degree":["Master of Science"],"dc:format.medium":["ETD"],"dc:identifier.other":["vt_gsexam:4409"],"dc:identifier.uri":["http://hdl.handle.net/10919/71829"],"dc:publisher":["Virginia Tech"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject":["Synchrophasor","Phasor measurement unit","prioritization","non-quantifiable criteria"],"dc:title":["Phasor Measurement Units Applications Prioritization Based on Wide-Area Disturbance Events"],"dc:type":["Thesis"],"thesis:degree_discipline":["Electrical Engineering"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-07-22T22:19:21Z"}