Virginia Polytechnic Institute and State University
Long-term scheduling in underground coal mining using mixed binary programming
Abstract
dc:description.abstractRecognizing the complexity of coal mining management, e.g., the scarcity of financial resources and the high level of uncertainty, a mixed binary programming model has been developed as an aid for generating production schedules which maximize the associated net present value. Defining the mine layout as a precedence network, with the nodes representing mining blocks, a solution procedure is developed, based on Benders' partitioning scheme. That is, the procedure iterates between two problems, namely, the master (primal) problem, solved by a combination of heuristic and exact methods, and the subproblem (dual problem), solved partly by inspection and partly as a minimal cost network flow problem. The heuristic methods are based on improvements of existing algorithms for scheduling precedence-related jobs on m processors. Computational experiences are presented and the procedure is demonstrated on a mining case.
Degree
thesis:*- Name thesis:degree_name
- Ph. D.
- Level thesis:degree_level
- doctoral
- Discipline thesis:degree_discipline
- Industrial Engineering and Operations Research
- Department dc:contributor.department
- Industrial Engineering and Operations Research
- Grantor dc:publisher
- Virginia Polytechnic Institute and State University
- Year dc:date.issued
- 1989
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- West-Hansen, Jan
- Chair dc:contributor.committeechair
-
- Sarin, Subhash C.
- Committee members dc:contributor.committeemember
-
- Adel, Gregory T.
- Freeman, H. J.
- Sherali, Hanif
- Suboleski, Stanley C.
Rights
dc:rights- Statement dc:rights
-
- In Copyright
- Licence dc:rights.uri
- Language dc:language.iso
- en_US
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/10919/54807
- OAI identifier oai:identifier
- oai:vtechworks.lib.vt.edu:10919/54807