{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/43814"},"canonical_url":"https://search.dev.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/43814","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"A risk management process for complex projects","abstract":"A more effective and efficient method to identify, assess, track and document project risks was explored. Using the systems engineering approach, an adaptable, repeatable risk management process was designed for complex projects (typically multi-million dollar electronics I defense contracts with advanced technology, aggressive schedules and multiple contractors I subcontractors). Structured tools and techniques were synthesized to increase the probability of risk identification, to facilitate qualitative and quantitative risk assessment, to graphically portray risk reduction priorities and to provide a vehicle for improved communication and traceability of risk reduction activity across the project team. A description of the process used to survey current risk management methods, to ascertain the critical risk management process requirements and to define a means to prioritize risks for more effective resource allocation is included.","abstract_html":"A more effective and efficient method to identify, assess, track and document project risks was explored. Using the systems engineering approach, an adaptable, repeatable risk management process was designed for complex projects (typically multi-million dollar electronics I defense contracts with advanced technology, aggressive schedules and multiple contractors I subcontractors). Structured tools and techniques were synthesized to increase the probability of risk identification, to facilitate qualitative and quantitative risk assessment, to graphically portray risk reduction priorities and to provide a vehicle for improved communication and traceability of risk reduction activity across the project team. A description of the process used to survey current risk management methods, to ascertain the critical risk management process requirements and to define a means to prioritize risks for more effective resource allocation is included.","abstract_has_math":false,"creators":["Brown, Robert G."],"institution":"Virginia Tech","degree_name":"Master of Science","degree_level":"masters","degree_discipline":"Systems Engineering","degree_department":"Systems Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":["Hardcastle, Valerie Gray"],"committee_members":["Harmon, L. Kenneth Jr.","Brotzman, E. D."],"year":1995,"date_issued":"1995-11-06","date_published":"1995-11-06","updated_at":"2026-07-22T22:20:08Z","subjects":["uncertainty","project"],"languages":["en"],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-07212009-040553"],"render_values":[{"text":"etd-07212009-040553","href":null,"code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/10919/43814","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["Hardcastle, Valerie Gray"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Harmon, L. Kenneth Jr.","Brotzman, E. D."]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering"]},{"key":"dc:creator","label":"Author","values":["Brown, Robert G."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-14T21:40:49Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-14T21:40:49Z","2009-07-21"]},{"key":"dc:date.issued","label":"Date","values":["1995-11-06"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Tech"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.dcmitype","label":"Dc Type Dcmitype","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["uncertainty","project"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-07212009-040553"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/43814"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["A more effective and efficient method to identify, assess, track and document project risks was explored. Using the systems engineering approach, an adaptable, repeatable risk management process was designed for complex projects (typically multi-million dollar electronics I defense contracts with advanced technology, aggressive schedules and multiple contractors I subcontractors). Structured tools and techniques were synthesized to increase the probability of risk identification, to facilitate qualitative and quantitative risk assessment, to graphically portray risk reduction priorities and to provide a vehicle for improved communication and traceability of risk reduction activity across the project team. A description of the process used to survey current risk management methods, to ascertain the critical risk management process requirements and to define a means to prioritize risks for more effective resource allocation is included."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Science"]},{"key":"dc:format.medium","label":"Dc Format Medium","values":["BTD"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["A risk management process for complex projects"]}]}],"canonical_facts":{"dc:contributor.committeechair":["Hardcastle, Valerie Gray"],"dc:contributor.committeemember":["Harmon, L. Kenneth Jr.","Brotzman, E. D."],"dc:contributor.department":["Systems Engineering"],"dc:creator":["Brown, Robert G."],"dc:date.accessioned":["2014-03-14T21:40:49Z"],"dc:date.available":["2014-03-14T21:40:49Z","2009-07-21"],"dc:date.issued":["1995-11-06"],"dc:description.abstract":["A more effective and efficient method to identify, assess, track and document project risks was explored. Using the systems engineering approach, an adaptable, repeatable risk management process was designed for complex projects (typically multi-million dollar electronics I defense contracts with advanced technology, aggressive schedules and multiple contractors I subcontractors). Structured tools and techniques were synthesized to increase the probability of risk identification, to facilitate qualitative and quantitative risk assessment, to graphically portray risk reduction priorities and to provide a vehicle for improved communication and traceability of risk reduction activity across the project team. A description of the process used to survey current risk management methods, to ascertain the critical risk management process requirements and to define a means to prioritize risks for more effective resource allocation is included."],"dc:description.degree":["Master of Science"],"dc:format.medium":["BTD"],"dc:format.mimetype":["application/pdf"],"dc:identifier.other":["etd-07212009-040553"],"dc:identifier.uri":["http://hdl.handle.net/10919/43814"],"dc:language.iso":["en"],"dc:publisher":["Virginia Tech"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject":["uncertainty","project"],"dc:title":["A risk management process for complex projects"],"dc:type":["Thesis"],"dc:type.dcmitype":["Text"],"thesis:degree_discipline":["Systems Engineering"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-07-22T22:20:08Z"}