{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/43167"},"canonical_url":"https://search.dev.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/43167","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"Concrete bridge prioritization system","abstract":"An alternative method of prioritization for concrete bridge maintenance, repair, and rehabilitation activities is required due to the inability of the current system to manage the increasing numnber of aging concrete bridges. The Concrete Bridge Prioritization System was proposed because of its ability to address the critical technical parameters of safety and cost benefit in prioritization of funding and work allocation. The analysis includes four parts, service life assessment, service life extension, cost calculation, and prioritization. The system combines these parts to optimize consideration of the technical parameters. A systems engineering approach to the investigation and design of the Concrete Bridge Prioritization System is included.","abstract_html":"An alternative method of prioritization for concrete bridge maintenance, repair, and rehabilitation activities is required due to the inability of the current system to manage the increasing numnber of aging concrete bridges. The Concrete Bridge Prioritization System was proposed because of its ability to address the critical technical parameters of safety and cost benefit in prioritization of funding and work allocation. The analysis includes four parts, service life assessment, service life extension, cost calculation, and prioritization. The system combines these parts to optimize consideration of the technical parameters. A systems engineering approach to the investigation and design of the Concrete Bridge Prioritization System is included.","abstract_has_math":false,"creators":["Kesselring, Debbie Anne"],"institution":"Virginia Tech","degree_name":"Master of Science","degree_level":"masters","degree_discipline":"Systems Engineering","degree_department":"Systems Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":["Thangjitham, Surot"],"committee_members":["Drew, Donald R.","Alfieri, Paul A."],"year":1995,"date_issued":"1995-06-05","date_published":"1995-06-05","updated_at":"2026-07-22T22:18:49Z","subjects":["aging bridges"],"languages":["en"],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-06112009-063545"],"render_values":[{"text":"etd-06112009-063545","href":null,"code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/10919/43167","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["Thangjitham, Surot"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Drew, Donald R.","Alfieri, Paul A."]},{"key":"dc:contributor.department","label":"Department","values":["Systems Engineering"]},{"key":"dc:creator","label":"Author","values":["Kesselring, Debbie Anne"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-14T21:37:58Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-14T21:37:58Z","2009-06-11"]},{"key":"dc:date.issued","label":"Date","values":["1995-06-05"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Tech"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.dcmitype","label":"Dc Type Dcmitype","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["aging bridges"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-06112009-063545"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/43167"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["An alternative method of prioritization for concrete bridge maintenance, repair, and rehabilitation activities is required due to the inability of the current system to manage the increasing numnber of aging concrete bridges. The Concrete Bridge Prioritization System was proposed because of its ability to address the critical technical parameters of safety and cost benefit in prioritization of funding and work allocation. The analysis includes four parts, service life assessment, service life extension, cost calculation, and prioritization. The system combines these parts to optimize consideration of the technical parameters. A systems engineering approach to the investigation and design of the Concrete Bridge Prioritization System is included."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Science"]},{"key":"dc:format.medium","label":"Dc Format Medium","values":["BTD"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Concrete bridge prioritization system"]}]}],"canonical_facts":{"dc:contributor.committeechair":["Thangjitham, Surot"],"dc:contributor.committeemember":["Drew, Donald R.","Alfieri, Paul A."],"dc:contributor.department":["Systems Engineering"],"dc:creator":["Kesselring, Debbie Anne"],"dc:date.accessioned":["2014-03-14T21:37:58Z"],"dc:date.available":["2014-03-14T21:37:58Z","2009-06-11"],"dc:date.issued":["1995-06-05"],"dc:description.abstract":["An alternative method of prioritization for concrete bridge maintenance, repair, and rehabilitation activities is required due to the inability of the current system to manage the increasing numnber of aging concrete bridges. The Concrete Bridge Prioritization System was proposed because of its ability to address the critical technical parameters of safety and cost benefit in prioritization of funding and work allocation. The analysis includes four parts, service life assessment, service life extension, cost calculation, and prioritization. The system combines these parts to optimize consideration of the technical parameters. A systems engineering approach to the investigation and design of the Concrete Bridge Prioritization System is included."],"dc:description.degree":["Master of Science"],"dc:format.medium":["BTD"],"dc:format.mimetype":["application/pdf"],"dc:identifier.other":["etd-06112009-063545"],"dc:identifier.uri":["http://hdl.handle.net/10919/43167"],"dc:language.iso":["en"],"dc:publisher":["Virginia Tech"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject":["aging bridges"],"dc:title":["Concrete bridge prioritization system"],"dc:type":["Thesis"],"dc:type.dcmitype":["Text"],"thesis:degree_discipline":["Systems Engineering"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-07-22T22:18:49Z"}