Back to results

Virginia Tech

Optimizing loblolly pine management with stochastic dynamic programming

Abstract

dc:description.abstract

This study examines effects of unpredictable price fluctuations and possible catastrophic losses on the optimal site preparation intensity of un thinned loblolly pine plantations under the assumption of lisk aversion. It concentrates exclusively on financial motives and does not take non-market values and portfolio considerations into account. The results should be interpreted with these limitations in mind. Two approaches are taken to compare site preparation intensities: a quasideterministic approach, where expected cash flows are discounted with risk-adjusted discount rates, and a stochastic approach, where probability functions of cash flows are used to maximize expected utility from net present values. The stochastic approach is further divided into non-adaptive scenarios and adaptive scenarios, where the investor can gather additional price information during the life of a stand to optimize the harvest decision. The adaptive management problem is solved with stochastic dynamic programming. For each possible harvest age, an optimal reservation price below which the forest landowner should not sell the stumpage is calculated. The study shows that the use of a single risk-adjusted discount rate is generally inadequate to compare different management intensities. The stochastic approaches reveal that the optimal management intensity depends on the degree of risk aversion, with increasing risk aversion leading to a lower intensity level. Given the possibility of catastrophic losses, the adoption of a feedback harvesting policy strengthens the already dominant influence of risk aversion and does not generally lead to an increase in management intensity. The study's results suggest that even if the landowner is managing the forest solely for financial reasons, some of the reluctance to invest in intensive forestry may not indicate a lack of interest or information but simply an economic reaction to risk, especially in regions with a high potential danger of catastrophic losses.

Degree

thesis:*
Name thesis:degree_name
Ph. D.
Level thesis:degree_level
doctoral
Discipline thesis:degree_discipline
Forestry
Department dc:contributor.department
Forestry
Grantor dc:publisher
Virginia Tech
Year dc:date.issued
1993

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Häring, Thomas W.
Chair dc:contributor.committeechair
  • Klemperer, W. David
Committee members dc:contributor.committeemember
  • Peterson, Everett B.
  • Sullivan, Jay
  • Taylor, Daniel B.
  • Wisdom, Harold W.

Rights

dc:rights
Statement dc:rights
  • In Copyright
Language dc:language.iso
en

Identifiers

dc:identifier.*
Dc Identifier Other
etd-10022007-144537
OAI identifier oai:identifier
oai:vtechworks.lib.vt.edu:10919/39478

Chain of custody

source
Harvested from
Virginia Tech
Base URL
vtechworks.lib.vt.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
related terms
citation

Häring, Thomas W.. Optimizing loblolly pine management with stochastic dynamic programming. doctoral thesis, Virginia Tech, 1993. http://hdl.handle.net/10919/39478