Back to results

Virginia Tech

Control Charts with Missing Observations

Abstract

dc:description.abstract

Traditional control charts for process monitoring are based on taking samples from the process at regular time intervals. However, it is often possible in practice for observations, and even entire samples, to be missing. This dissertation investigates missing observations in Exponentially Weighted Moving Average (EWMA) and Multivariate EWMA (MEWMA) control charts. The standardized sample mean is used since this adjusts the sample mean for the fact that part of the sample may be missing. It also allows for constant control limits even though the sample size varies randomly. When complete samples are missing, the weights between samples should also be adjusted. In the univariate case, three approaches for adjusting the weights of the EWMA control statistic are investigated: (1) ignoring missing samples; (2) adding the weights from previous consecutive missing samples to the current sample; and (3) increasing the weights of non-missing samples in proportion, so that the weights sum to one. Integral equation and Markov chain methods are developed to find and compare the statistical properties of these charts. The EI chart, which adjusts the weights by ignoring the missing samples, has the best overall performance. The multivariate case in which information on some of the variables is missing is also examined using MEWMA charts. Two methods for adjusting the weights of the MEWMA control statistic are investigated and compared using simulation: (1) ignoring all the data at a sampling point if the data for at least one variable is missing; and (2) using the previous EWMA value for any variable for which all the data are missing. Both of these methods are examined when the in-control covariance matrix is adjusted at each sampling point to account for missing observations, and when it is not adjusted. The MS control chart, which uses the previous value of the EWMA statistic for a variable if all of the data for that variable is missing at a sampling point, provides the best overall performance. The in-control covariance matrix needs to be adjusted at each sampling point, unless the variables are independent or only weakly correlated.

Degree

thesis:*
Name thesis:degree_name
Ph. D.
Level thesis:degree_level
doctoral
Discipline thesis:degree_discipline
Statistics
Department dc:contributor.department
Statistics
Grantor dc:publisher
Virginia Tech
Year dc:date.issued
2009

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Wilson, Sara R.
Chair dc:contributor.committeechair
  • Reynolds, Marion R. Jr.
Committee members dc:contributor.committeemember
  • Kim, Dong-Yun
  • Smith, Eric P.
  • Woodall, William H.

Subjects

dc:subject × 5

Rights

dc:rights
Statement dc:rights
  • In Copyright

Identifiers

dc:identifier.*
Dc Identifier Other
etd-04142009-133018
OAI identifier oai:identifier
oai:vtechworks.lib.vt.edu:10919/37623

Chain of custody

source
Harvested from
Virginia Tech
Base URL
vtechworks.lib.vt.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Wilson, Sara R.. Control Charts with Missing Observations. doctoral thesis, Virginia Tech, 2009. http://hdl.handle.net/10919/37623