{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/36984"},"canonical_url":"https://search.dev.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/36984","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"Use of Team Building on Construction Projects to Reduce Cost Growth and Schedule Growth","abstract":"The benefits of the team building process have been examined for many years by several organizations. The Army Corp of Engineers, Project Management Institute, and Construction Industry Institute studies provided the foundation for this research. Cost growth and schedule growth are two areas that were suspected to be improved by the use of team building. A thorough statistical and graphical analysis was conducted to evaluate the effects of the team building process on cost growth and schedule growth. The project phases and demographic slices were examined for both the contractors and owners. The analysis of the relationship between the team building process and reduction of cost growth and schedule growth provides overwhelming support for implementing the process on construction projects. Although results of particular projects are not always supportive, the overall trends indicate that both budget overruns and schedule extensions can be reduced by the use of a team building process. Particular project categories have been identified as very susceptible to the positive influences of the team building process. Early implementation appears to be crucial in maximizing the benefits of the team building process.","abstract_html":"The benefits of the team building process have been examined for many years by several organizations. The Army Corp of Engineers, Project Management Institute, and Construction Industry Institute studies provided the foundation for this research. Cost growth and schedule growth are two areas that were suspected to be improved by the use of team building. A thorough statistical and graphical analysis was conducted to evaluate the effects of the team building process on cost growth and schedule growth. The project phases and demographic slices were examined for both the contractors and owners. The analysis of the relationship between the team building process and reduction of cost growth and schedule growth provides overwhelming support for implementing the process on construction projects. Although results of particular projects are not always supportive, the overall trends indicate that both budget overruns and schedule extensions can be reduced by the use of a team building process. Particular project categories have been identified as very susceptible to the positive influences of the team building process. Early implementation appears to be crucial in maximizing the benefits of the team building process.","abstract_has_math":false,"creators":["Williams, Terry L."],"institution":"Virginia Tech","degree_name":"Master of Science","degree_level":"masters","degree_discipline":"Civil Engineering","degree_department":"Civil Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":["de la Garza, Jesus M."],"committee_members":["Auchey, Flynn L.","Vorster, Michael C."],"year":1998,"date_issued":"1998-09-05","date_published":"1998-09-05","updated_at":"2026-07-22T22:19:56Z","subjects":["Construction Management","Team Building","Partnering","Cost Growth","Schedule Growth"],"languages":[],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-81698-17500"],"render_values":[{"text":"etd-81698-17500","href":null,"code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/10919/36984","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["de la Garza, Jesus M."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Auchey, Flynn L.","Vorster, Michael C."]},{"key":"dc:contributor.department","label":"Department","values":["Civil Engineering"]},{"key":"dc:creator","label":"Author","values":["Williams, Terry L."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-14T20:52:25Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-14T20:52:25Z","1998-09-17"]},{"key":"dc:date.issued","label":"Date","values":["1998-09-05"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Tech"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Construction Management","Team Building","Partnering","Cost Growth","Schedule Growth"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-81698-17500"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/36984"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The benefits of the team building process have been examined for many years by several organizations. The Army Corp of Engineers, Project Management Institute, and Construction Industry Institute studies provided the foundation for this research. Cost growth and schedule growth are two areas that were suspected to be improved by the use of team building. A thorough statistical and graphical analysis was conducted to evaluate the effects of the team building process on cost growth and schedule growth. The project phases and demographic slices were examined for both the contractors and owners. The analysis of the relationship between the team building process and reduction of cost growth and schedule growth provides overwhelming support for implementing the process on construction projects. Although results of particular projects are not always supportive, the overall trends indicate that both budget overruns and schedule extensions can be reduced by the use of a team building process. Particular project categories have been identified as very susceptible to the positive influences of the team building process. Early implementation appears to be crucial in maximizing the benefits of the team building process."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Science"]},{"key":"dc:title","label":"Title","values":["Use of Team Building on Construction Projects to Reduce Cost Growth and Schedule Growth"]}]}],"canonical_facts":{"dc:contributor.committeechair":["de la Garza, Jesus M."],"dc:contributor.committeemember":["Auchey, Flynn L.","Vorster, Michael C."],"dc:contributor.department":["Civil Engineering"],"dc:creator":["Williams, Terry L."],"dc:date.accessioned":["2014-03-14T20:52:25Z"],"dc:date.available":["2014-03-14T20:52:25Z","1998-09-17"],"dc:date.issued":["1998-09-05"],"dc:description.abstract":["The benefits of the team building process have been examined for many years by several organizations. The Army Corp of Engineers, Project Management Institute, and Construction Industry Institute studies provided the foundation for this research. Cost growth and schedule growth are two areas that were suspected to be improved by the use of team building. A thorough statistical and graphical analysis was conducted to evaluate the effects of the team building process on cost growth and schedule growth. The project phases and demographic slices were examined for both the contractors and owners. The analysis of the relationship between the team building process and reduction of cost growth and schedule growth provides overwhelming support for implementing the process on construction projects. Although results of particular projects are not always supportive, the overall trends indicate that both budget overruns and schedule extensions can be reduced by the use of a team building process. Particular project categories have been identified as very susceptible to the positive influences of the team building process. Early implementation appears to be crucial in maximizing the benefits of the team building process."],"dc:description.degree":["Master of Science"],"dc:identifier.other":["etd-81698-17500"],"dc:identifier.uri":["http://hdl.handle.net/10919/36984"],"dc:publisher":["Virginia Tech"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject":["Construction Management","Team Building","Partnering","Cost Growth","Schedule Growth"],"dc:title":["Use of Team Building on Construction Projects to Reduce Cost Growth and Schedule Growth"],"dc:type":["Thesis"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-07-22T22:19:56Z"}