Back to results

Virginia Tech

Time-Based Manufacturing System Design for Softwood Lumber Production

Abstract

dc:description.abstract

Manufacturing industries in the United States continue to experience increasing pressure from foreign competition. Through decreasing product lead time, U.S. manufacturers can achieve a sustainable competitive advantage. Southern yellow pine manufacturing is an example of an industry that can benefit from product lead time reduction. This project involved a case study of a southern yellow pine lumber manufacturer. Value stream mapping was used to evaluate the current lead time for the lumber manufacturer as well as design future state systems. Current state evaluation discovered an average lead time of 35.3 days according to six months of inventory data. Four future state systems were developed according to current demand and had lead times ranging from 10.8 to 14.9 days. Lead time reduction was achieved through more closely synchronizing and planing operations with sawmill output. To illustrate the impact of lead time on financial performance, the amount of capital invested in inventory was evaluated for the current state value stream as well as the future state value streams. All of the future state capital inventory requirements were less than 50 percent of the current state capital inventory requirement. Implementation of future state value streams would allow the manufacturer to benefit from having more available capital. This research project also investigated the use of pull production at the softwood lumber manufacturing operation. Effective implementation of pull production would require improving headrig optimization programs, presorting material by grade before drying, little or no drying degrade, and reducing both drying and cooling time. Due to the technological requirements of pull production in lumber manufacturing, the system was not currently feasible for the lumber manufacturer. Future research efforts should be directed towards creating the technology necessary to economically implement pull production in the softwood sawmill industry.

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
Wood Science and Forest Products
Department dc:contributor.department
Wood Science and Forest Products
Grantor dc:publisher
Virginia Tech
Year dc:date.issued
2005

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Leonard, Henry Taylor
Chair dc:contributor.committeechair
  • Kline, D. Earl
Committee members dc:contributor.committeemember
  • Smith, Robert M.
  • Bond, Brian H.

Subjects

dc:subject × 4

Rights

dc:rights
Statement dc:rights
  • In Copyright

Identifiers

dc:identifier.*
Dc Identifier Other
etd-11302005-102751
OAI identifier oai:identifier
oai:vtechworks.lib.vt.edu:10919/35860

Chain of custody

source
Harvested from
Virginia Tech
Base URL
vtechworks.lib.vt.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Leonard, Henry Taylor. Time-Based Manufacturing System Design for Softwood Lumber Production. masters thesis, Virginia Tech, 2005. http://hdl.handle.net/10919/35860