Back to results

Virginia Tech

Project Scheduling in the Presence of Productivity Functions

Abstract

dc:description.abstract

The need for good quality project scheduling methods arises in many fields such as construction, manufacturing, and military operations, among others. In this thesis, we develop a solution methodology which determines the sequence in which the activities of the project must be processed and the resource allocation to each activity in the project to minimize the makespan of the project. We consider projects whose activities' durations are defined by convex, non-increasing time-resource trade-off functions and whose activities are not pre-emptable (i.e., once some amount of resource has been allocated to an activity, this resource level may not change while the activity is processed). The solution methodology first finds all potentially optimal sequences for a given project. However, rather than considering all possible sequences, we use special relationships between certain pairs activities to determine a priori how these pairs will be sequenced in relation to each other. Then, the optimal resource allocations are determine for each sequence and the solution with the smallest makespan is selected.

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
Industrial and Systems Engineering
Department dc:contributor.department
Industrial and Systems Engineering
Grantor dc:publisher
Virginia Tech
Year dc:date.issued
2009

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Steeneck, Daniel Waymouth
Chair dc:contributor.committeechair
  • Sarin, Subhash C.
Committee members dc:contributor.committeemember
  • Bish, Doug R.
  • Sturges, Robert H.

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • In Copyright

Identifiers

dc:identifier.*
Dc Identifier Other
etd-07252009-202236
OAI identifier oai:identifier
oai:vtechworks.lib.vt.edu:10919/34169

Chain of custody

source
Harvested from
Virginia Tech
Base URL
vtechworks.lib.vt.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
citation

Steeneck, Daniel Waymouth. Project Scheduling in the Presence of Productivity Functions. masters thesis, Virginia Tech, 2009. http://hdl.handle.net/10919/34169