{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/31586"},"canonical_url":"https://search.dev.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/31586","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"An agent based manufacturing scheduling module for Advanced Planning and Scheduling","abstract":"A software agents based manufacturing scheduling module for Advanced Planning and Scheduling (APS) is presented. The problem considered is scheduling of jobs with multiple operations, distinct operation processing times, arrival times, and due dates in a job shop environment. Sequence dependent setups are also considered. The additional constraints of material and resource availability are also taken into consideration. The scheduling is to be considered in integration with production planning. The production plans can be changed dynamically and the schedule is to be generated to reflect the appropriate changes. The design of a generic multi-agent framework which is domain independent along with algorithms that are used by the agents is also discussed.","abstract_html":"A software agents based manufacturing scheduling module for Advanced Planning and Scheduling (APS) is presented. The problem considered is scheduling of jobs with multiple operations, distinct operation processing times, arrival times, and due dates in a job shop environment. Sequence dependent setups are also considered. The additional constraints of material and resource availability are also taken into consideration. The scheduling is to be considered in integration with production planning. The production plans can be changed dynamically and the schedule is to be generated to reflect the appropriate changes. The design of a generic multi-agent framework which is domain independent along with algorithms that are used by the agents is also discussed.","abstract_has_math":false,"creators":["Attri, Hitesh"],"institution":"Virginia Tech","degree_name":"Master of Science","degree_level":"masters","degree_discipline":"Industrial and Systems Engineering","degree_department":"Industrial and Systems Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":["Chen, Fengshan Frank","Sarin, Subhash C."],"committee_members":["Jain, Sanjay"],"year":2005,"date_issued":"2005-01-04","date_published":"2005-01-04","updated_at":"2026-07-22T22:18:57Z","subjects":["Manufacturing Scheduling","Advanced Planning and Scheduling","Multi Agent Systems"],"languages":[],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-03312005-235418"],"render_values":[{"text":"etd-03312005-235418","href":null,"code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/10919/31586","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["Chen, Fengshan Frank","Sarin, Subhash C."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Jain, Sanjay"]},{"key":"dc:contributor.department","label":"Department","values":["Industrial and Systems Engineering"]},{"key":"dc:creator","label":"Author","values":["Attri, Hitesh"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-14T20:33:00Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-14T20:33:00Z","2011-09-05"]},{"key":"dc:date.issued","label":"Date","values":["2005-01-04"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Tech"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial and Systems Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Manufacturing Scheduling","Advanced Planning and Scheduling","Multi Agent Systems"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-03312005-235418"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/31586"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["A software agents based manufacturing scheduling module for Advanced Planning and Scheduling (APS) is presented. The problem considered is scheduling of jobs with multiple operations, distinct operation processing times, arrival times, and due dates in a job shop environment. Sequence dependent setups are also considered. The additional constraints of material and resource availability are also taken into consideration. The scheduling is to be considered in integration with production planning. The production plans can be changed dynamically and the schedule is to be generated to reflect the appropriate changes. The design of a generic multi-agent framework which is domain independent along with algorithms that are used by the agents is also discussed."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Science"]},{"key":"dc:title","label":"Title","values":["An agent based manufacturing scheduling module for Advanced Planning and Scheduling"]}]}],"canonical_facts":{"dc:contributor.committeechair":["Chen, Fengshan Frank","Sarin, Subhash C."],"dc:contributor.committeemember":["Jain, Sanjay"],"dc:contributor.department":["Industrial and Systems Engineering"],"dc:creator":["Attri, Hitesh"],"dc:date.accessioned":["2014-03-14T20:33:00Z"],"dc:date.available":["2014-03-14T20:33:00Z","2011-09-05"],"dc:date.issued":["2005-01-04"],"dc:description.abstract":["A software agents based manufacturing scheduling module for Advanced Planning and Scheduling (APS) is presented. The problem considered is scheduling of jobs with multiple operations, distinct operation processing times, arrival times, and due dates in a job shop environment. Sequence dependent setups are also considered. The additional constraints of material and resource availability are also taken into consideration. The scheduling is to be considered in integration with production planning. The production plans can be changed dynamically and the schedule is to be generated to reflect the appropriate changes. The design of a generic multi-agent framework which is domain independent along with algorithms that are used by the agents is also discussed."],"dc:description.degree":["Master of Science"],"dc:identifier.other":["etd-03312005-235418"],"dc:identifier.uri":["http://hdl.handle.net/10919/31586"],"dc:publisher":["Virginia Tech"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject":["Manufacturing Scheduling","Advanced Planning and Scheduling","Multi Agent Systems"],"dc:title":["An agent based manufacturing scheduling module for Advanced Planning and Scheduling"],"dc:type":["Thesis"],"thesis:degree_discipline":["Industrial and Systems Engineering"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-07-22T22:18:57Z"}