{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/31514"},"canonical_url":"https://search.dev.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/31514","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"The Relationship Between Process and Manufacturing Plant Performance: a Goal Programming Data Envelopement Analysis Approach","abstract":"There are three interrelated objectives in a manufacturing facility that are important for the planning and control of a technology comprised of serial production processes. These objectives include plant effectiveness, process effectiveness and a production line-balance between consecutive stages. Plant effectiveness is the degree to which the facility meets its pre-determined plant-level targets. Process effectiveness is the degree to which the production processes meets their pre-determined resource (input) and output targets. The concept of balance exemplifies the degree to which the serial processes exhibit bottlenecks. In this research, all the above three objectives are modeled using a serial-manufacturing goal-programming (SMGP) approach. The results obtained from the SMGP approach are used in conjunction with the traditional DEA analysis to evaluate the overall performance of the plant. This approach is applied to a printed circuit board manufacturing firm for which data has been accumulated for a two-year period.","abstract_html":"There are three interrelated objectives in a manufacturing facility that are important for the planning and control of a technology comprised of serial production processes. These objectives include plant effectiveness, process effectiveness and a production line-balance between consecutive stages. Plant effectiveness is the degree to which the facility meets its pre-determined plant-level targets. Process effectiveness is the degree to which the production processes meets their pre-determined resource (input) and output targets. The concept of balance exemplifies the degree to which the serial processes exhibit bottlenecks. In this research, all the above three objectives are modeled using a serial-manufacturing goal-programming (SMGP) approach. The results obtained from the SMGP approach are used in conjunction with the traditional DEA analysis to evaluate the overall performance of the plant. This approach is applied to a printed circuit board manufacturing firm for which data has been accumulated for a two-year period.","abstract_has_math":false,"creators":["Partangel, Narayanan S."],"institution":"Virginia Tech","degree_name":"Master of Science","degree_level":"masters","degree_discipline":"Industrial and Systems Engineering","degree_department":"Industrial and Systems Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":["Triantis, Konstantinos P."],"committee_members":["Hoopes, Barbara J.","Harmon, L. Kenneth Jr."],"year":1999,"date_issued":"1999-09-17","date_published":"1999-09-17","updated_at":"2026-07-22T22:18:39Z","subjects":["Goal Programming","Data Envelopment Analysis"],"languages":[],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-03212000-19130002"],"render_values":[{"text":"etd-03212000-19130002","href":null,"code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/10919/31514","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["Triantis, Konstantinos P."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Hoopes, Barbara J.","Harmon, L. Kenneth Jr."]},{"key":"dc:contributor.department","label":"Department","values":["Industrial and Systems Engineering"]},{"key":"dc:creator","label":"Author","values":["Partangel, Narayanan S."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-14T20:32:46Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-14T20:32:46Z","2001-03-29"]},{"key":"dc:date.issued","label":"Date","values":["1999-09-17"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Tech"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial and Systems Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Goal Programming","Data Envelopment Analysis"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-03212000-19130002"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/31514"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["There are three interrelated objectives in a manufacturing facility that are important for the planning and control of a technology comprised of serial production processes. These objectives include plant effectiveness, process effectiveness and a production line-balance between consecutive stages. Plant effectiveness is the degree to which the facility meets its pre-determined plant-level targets. Process effectiveness is the degree to which the production processes meets their pre-determined resource (input) and output targets. The concept of balance exemplifies the degree to which the serial processes exhibit bottlenecks. In this research, all the above three objectives are modeled using a serial-manufacturing goal-programming (SMGP) approach. The results obtained from the SMGP approach are used in conjunction with the traditional DEA analysis to evaluate the overall performance of the plant. This approach is applied to a printed circuit board manufacturing firm for which data has been accumulated for a two-year period."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Science"]},{"key":"dc:title","label":"Title","values":["The Relationship Between Process and Manufacturing Plant Performance: a Goal Programming Data Envelopement Analysis Approach"]}]}],"canonical_facts":{"dc:contributor.committeechair":["Triantis, Konstantinos P."],"dc:contributor.committeemember":["Hoopes, Barbara J.","Harmon, L. Kenneth Jr."],"dc:contributor.department":["Industrial and Systems Engineering"],"dc:creator":["Partangel, Narayanan S."],"dc:date.accessioned":["2014-03-14T20:32:46Z"],"dc:date.available":["2014-03-14T20:32:46Z","2001-03-29"],"dc:date.issued":["1999-09-17"],"dc:description.abstract":["There are three interrelated objectives in a manufacturing facility that are important for the planning and control of a technology comprised of serial production processes. These objectives include plant effectiveness, process effectiveness and a production line-balance between consecutive stages. Plant effectiveness is the degree to which the facility meets its pre-determined plant-level targets. Process effectiveness is the degree to which the production processes meets their pre-determined resource (input) and output targets. The concept of balance exemplifies the degree to which the serial processes exhibit bottlenecks. In this research, all the above three objectives are modeled using a serial-manufacturing goal-programming (SMGP) approach. The results obtained from the SMGP approach are used in conjunction with the traditional DEA analysis to evaluate the overall performance of the plant. This approach is applied to a printed circuit board manufacturing firm for which data has been accumulated for a two-year period."],"dc:description.degree":["Master of Science"],"dc:identifier.other":["etd-03212000-19130002"],"dc:identifier.uri":["http://hdl.handle.net/10919/31514"],"dc:publisher":["Virginia Tech"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject":["Goal Programming","Data Envelopment Analysis"],"dc:title":["The Relationship Between Process and Manufacturing Plant Performance: a Goal Programming Data Envelopement Analysis Approach"],"dc:type":["Thesis"],"thesis:degree_discipline":["Industrial and Systems Engineering"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-07-22T22:18:39Z"}