{"id":{"repo_id":"vt","oai_identifier":"oai:vtechworks.lib.vt.edu:10919/31200"},"canonical_url":"https://search.dev.ndltd.org/etd/vt/oai:vtechworks.lib.vt.edu:10919/31200","repository":{"repo_id":"vt","name":"Virginia Tech","base_url":"https://vtechworks.lib.vt.edu/oai/request"},"display":{"title":"A Practical Comprehensive Approach to PMU Placement for Full Observability","abstract":"In recent years, the placement of phasor measurement units (PMUs) in electric transmission systems has gained much attention. Engineers and mathematicians have developed a variety of algorithms to determine the best locations for PMU installation. But often these placement algorithms are not practical for real systems and do not cover the whole process. This thesis presents a strategy that is practical and addresses three important topics: system preparation, placement algorithm, and installation scheduling. To be practical, a PMU strategy should strive for full observability, work well within the heterogeneous nature of power system topology, and enable system planners to adapt the strategy to meet their unique needs and system configuration. Practical considerations for the three placement topics are discussed, and a specific strategy based on these considerations is developed and demonstrated on real transmission system models.","abstract_html":"In recent years, the placement of phasor measurement units (PMUs) in electric transmission systems has gained much attention. Engineers and mathematicians have developed a variety of algorithms to determine the best locations for PMU installation. But often these placement algorithms are not practical for real systems and do not cover the whole process. This thesis presents a strategy that is practical and addresses three important topics: system preparation, placement algorithm, and installation scheduling. To be practical, a PMU strategy should strive for full observability, work well within the heterogeneous nature of power system topology, and enable system planners to adapt the strategy to meet their unique needs and system configuration. Practical considerations for the three placement topics are discussed, and a specific strategy based on these considerations is developed and demonstrated on real transmission system models.","abstract_has_math":false,"creators":["Altman, James Ross"],"institution":"Virginia Tech","degree_name":"Master of Science","degree_level":"masters","degree_discipline":"Electrical and Computer Engineering","degree_department":"Electrical and Computer Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":["Centeno, Virgilio A."],"committee_members":["De La Ree, Jaime","Liu, Yilu"],"year":2008,"date_issued":"2008-01-28","date_published":"2008-01-28","updated_at":"2026-07-22T22:20:07Z","subjects":["Depth of Unobservability","observability","PMU placement problem","greedy algorithms","placement model"],"languages":[],"rights":["In Copyright"],"rights_urls":["http://rightsstatements.org/vocab/InC/1.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-02102008-120036"],"render_values":[{"text":"etd-02102008-120036","href":null,"code":true}]}]},"links":{"outbound_url":"http://hdl.handle.net/10919/31200","outbound_label":"Handle","outbound_source":"dc:identifier.uri"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["Centeno, Virgilio A."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["De La Ree, Jaime","Liu, Yilu"]},{"key":"dc:contributor.department","label":"Department","values":["Electrical and Computer Engineering"]},{"key":"dc:creator","label":"Author","values":["Altman, James Ross"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-14T20:31:42Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-14T20:31:42Z","2008-03-27"]},{"key":"dc:date.issued","label":"Date","values":["2008-01-28"]},{"key":"dc:publisher","label":"Institution","values":["Virginia Tech"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Electrical and Computer Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Virginia Polytechnic Institute and State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Depth of Unobservability","observability","PMU placement problem","greedy algorithms","placement model"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["In Copyright"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/vocab/InC/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["etd-02102008-120036"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10919/31200"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["In recent years, the placement of phasor measurement units (PMUs) in electric transmission systems has gained much attention. Engineers and mathematicians have developed a variety of algorithms to determine the best locations for PMU installation. But often these placement algorithms are not practical for real systems and do not cover the whole process. This thesis presents a strategy that is practical and addresses three important topics: system preparation, placement algorithm, and installation scheduling. To be practical, a PMU strategy should strive for full observability, work well within the heterogeneous nature of power system topology, and enable system planners to adapt the strategy to meet their unique needs and system configuration. Practical considerations for the three placement topics are discussed, and a specific strategy based on these considerations is developed and demonstrated on real transmission system models."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Science"]},{"key":"dc:title","label":"Title","values":["A Practical Comprehensive Approach to PMU Placement for Full Observability"]}]}],"canonical_facts":{"dc:contributor.committeechair":["Centeno, Virgilio A."],"dc:contributor.committeemember":["De La Ree, Jaime","Liu, Yilu"],"dc:contributor.department":["Electrical and Computer Engineering"],"dc:creator":["Altman, James Ross"],"dc:date.accessioned":["2014-03-14T20:31:42Z"],"dc:date.available":["2014-03-14T20:31:42Z","2008-03-27"],"dc:date.issued":["2008-01-28"],"dc:description.abstract":["In recent years, the placement of phasor measurement units (PMUs) in electric transmission systems has gained much attention. Engineers and mathematicians have developed a variety of algorithms to determine the best locations for PMU installation. But often these placement algorithms are not practical for real systems and do not cover the whole process. This thesis presents a strategy that is practical and addresses three important topics: system preparation, placement algorithm, and installation scheduling. To be practical, a PMU strategy should strive for full observability, work well within the heterogeneous nature of power system topology, and enable system planners to adapt the strategy to meet their unique needs and system configuration. Practical considerations for the three placement topics are discussed, and a specific strategy based on these considerations is developed and demonstrated on real transmission system models."],"dc:description.degree":["Master of Science"],"dc:identifier.other":["etd-02102008-120036"],"dc:identifier.uri":["http://hdl.handle.net/10919/31200"],"dc:publisher":["Virginia Tech"],"dc:rights":["In Copyright"],"dc:rights.uri":["http://rightsstatements.org/vocab/InC/1.0/"],"dc:subject":["Depth of Unobservability","observability","PMU placement problem","greedy algorithms","placement model"],"dc:title":["A Practical Comprehensive Approach to PMU Placement for Full Observability"],"dc:type":["Thesis"],"thesis:degree_discipline":["Electrical and Computer Engineering"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Science"],"thesis:institution_name":["Virginia Polytechnic Institute and State University"]},"updated_at":"2026-07-22T22:20:07Z"}