The effect of estimated processing times versus actual (standard) processing times on various performance measures in a pure job shop

Abstract

dc:description.abstract

A comparative simulation study was performed to investigate the effect of uncertainty or unreliability in job processing times on designing schedules in a pure job shop environment. Five performance measures were employed in an effort to examine the effect of variations between estimated and actual processing times. These variations are common in job shop systems where estimations are used to set processing times. It was hypothesized that a variation has an effect on relative system performance. In addition, three priority rules, namely, FIFO, SOT and EDD, were studied to determine the best rule for controlling the shop in situations of unreliable processing times data. The percentage variation in processing times was clearly the dominant variable for most of the performance measures. A 60% variation in estimated processing times appeared to be the maximum level under which the mean flowtime, mean tardiness and percent of late jobs performance measures were insensitive. The simulation results indicated that the makespan and average shop utilization performance measures were insensitive to reliability of input information about processing times for up to a 100%. The performance of FIFO and EDD priority rules suffered drastically while SOT was the least sensitive to the reliability of processing times information.

Degree

thesis:*
Name thesis:degree_name
M.S.
Level thesis:degree_level
masters
Discipline thesis:degree_discipline
Industrial Engineering and Operations Research
Department dc:contributor.department
Industrial Engineering and Operations Research
Grantor dc:publisher
Virginia Polytechnic Institute and State University
Year dc:date.issued
1983

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Emaminezhad, Farzad

Rights

dc:rights
Statement dc:rights
  • In Copyright
Language dc:language.iso
en

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/10919/101428
OAI identifier oai:identifier
oai:vtechworks.lib.vt.edu:10919/101428

Chain of custody

source
Harvested from
Virginia Tech
Base URL
vtechworks.lib.vt.edu/oai/request
Last updated
2026-07-22
Source record
OAI-PMH GetRecord
related terms
citation

Emaminezhad, Farzad. The effect of estimated processing times versus actual (standard) processing times on various performance measures in a pure job shop. masters thesis, Virginia Polytechnic Institute and State University, 1983. http://hdl.handle.net/10919/101428