{"id":{"repo_id":"uwtsd","oai_identifier":"oai:repository.uwtsd.ac.uk:2243"},"canonical_url":"https://search.dev.ndltd.org/etd/uwtsd/oai:repository.uwtsd.ac.uk:2243","repository":{"repo_id":"uwtsd","name":"University of Wales Trinity Saint David","base_url":"https://repository.uwtsd.ac.uk/cgi/oai2"},"display":{"title":"Improving approaches to material inventory management in construction industry in the UK","abstract":"Materials used in construction constitute a major proportion of the total cost of construction projects. An important factor of great concern that adversely affects construction projects is the location and tracking of materials, which normally come in bulk with minimal identification. There is inadequate integration of modern wireless technologies (such as Radio Frequency Identification (RFID), Personal Digital Assistant (PDA) or Just-in-Time (JIT)) into project management systems for easier and faster materials management and tracking and to overcome human error. This research focuses on improving approaches to material inventory management in the UK construction industry through the formulation of an RFID-based materials management tracking process system with projects. The existing literature review identified many challenges/problems in material inventory management on construction projects, such as supply delays, shortages, price fluctuations, wastage and damage, and insufficient storage space. Six construction projects were selected as exploratory case studies and cross-case analysis was used to investigate approaches to material inventory management practices: problems, implementation of ICT, and the potential for using emerging wireless technologies and systems (such as RFID and PDA) for materials tracking. Findings showed that there were similar problems of storage constraints and logistics with most of the construction projects. The synthesis of good practices required the implementation of RFID-facilitated construction management of materials tracking system to make material handling easier, quicker, more efficient and less paperwork. There was also a recommendation to implement Information and Communication Technology (ICT) tools to integrate plant, labour and materials into one system. The findings from the case studies and the literature review were used to formulate a process for real-time material tracking using Radio Frequency Identification (RFID) that can improve material inventory management in the UK construction industry. Testing and validation undertaken assisted in formulating a process that can be useful, functional and acceptable for a possible process system’s development. Finally, research achievements/contributions to knowledge, and limitations were discussed and some suggestions for further research were outlined.","abstract_html":"Materials used in construction constitute a major proportion of the total cost of construction projects. An important factor of great concern that adversely affects construction projects is the location and tracking of materials, which normally come in bulk with minimal identification. There is inadequate integration of modern wireless technologies (such as Radio Frequency Identification (RFID), Personal Digital Assistant (PDA) or Just-in-Time (JIT)) into project management systems for easier and faster materials management and tracking and to overcome human error. This research focuses on improving approaches to material inventory management in the UK construction industry through the formulation of an RFID-based materials management tracking process system with projects. The existing literature review identified many challenges/problems in material inventory management on construction projects, such as supply delays, shortages, price fluctuations, wastage and damage, and insufficient storage space. Six construction projects were selected as exploratory case studies and cross-case analysis was used to investigate approaches to material inventory management practices: problems, implementation of ICT, and the potential for using emerging wireless technologies and systems (such as RFID and PDA) for materials tracking. Findings showed that there were similar problems of storage constraints and logistics with most of the construction projects. The synthesis of good practices required the implementation of RFID-facilitated construction management of materials tracking system to make material handling easier, quicker, more efficient and less paperwork. There was also a recommendation to implement Information and Communication Technology (ICT) tools to integrate plant, labour and materials into one system. The findings from the case studies and the literature review were used to formulate a process for real-time material tracking using Radio Frequency Identification (RFID) that can improve material inventory management in the UK construction industry. Testing and validation undertaken assisted in formulating a process that can be useful, functional and acceptable for a possible process system’s development. Finally, research achievements/contributions to knowledge, and limitations were discussed and some suggestions for further research were outlined.","abstract_has_math":false,"creators":["Nwankwo, Damian Chima"],"institution":"University of Wales Trinity Saint David","degree_name":"dba","degree_level":"doctoral","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2023,"date_issued":"2023-01","date_published":"2023-01","updated_at":"2026-07-24T05:52:56Z","subjects":["AS Academïau a chymdeithasau dysgedig (Cyffredinol)","HE Cludiant a Chyfathrebiad","LB2361 Cwricwlwm","TA Peirianneg (Cyffredinol). Peirianneg Sifil (Cyffredinol)","TD Technoleg amgylcheddol. Peirianneg lanweithiol","TE Peirianneg briffyrdd. Ffyrdd a phalmentydd","TH Adeiladu adeiladau"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.grantnumber","label":"Dc Identifier Grantnumber","values":["UWTSD"],"render_values":[{"text":"UWTSD","href":null,"code":true}]}]},"links":{"outbound_url":"https://doi.org/10.82227/repository.uwtsd.ac.uk.00002243","outbound_label":"DOI","outbound_source":"dc:identifier.doi"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.sponsor","label":"Sponsor","values":["University of Wales Trinity Saint David"]},{"key":"dc:creator","label":"Author","values":["Nwankwo, Damian Chima"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2023-01-28"]},{"key":"dc:date.issued","label":"Date","values":["2023-01"]},{"key":"dc:publisher.commercial","label":"Dc Publisher Commercial","values":["University of Wales Trinity Saint David"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["Traethodau PhD","Institute of Management and Health: Business, Finance and Management"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Wales Trinity Saint David"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["https://repository.uwtsd.ac.uk/id/eprint/2243/"]},{"key":"dc:type","label":"Dc Type","values":["Gosodiad"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["doctoral"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["dba"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["AS Academïau a chymdeithasau dysgedig (Cyffredinol)","HE Cludiant a Chyfathrebiad","LB2361 Cwricwlwm","TA Peirianneg (Cyffredinol). Peirianneg Sifil (Cyffredinol)","TD Technoleg amgylcheddol. Peirianneg lanweithiol","TE Peirianneg briffyrdd. Ffyrdd a phalmentydd","TH Adeiladu adeiladau"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["10.82227/repository.uwtsd.ac.uk.00002243"]},{"key":"dc:identifier.grantnumber","label":"Dc Identifier Grantnumber","values":["UWTSD"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://repository.uwtsd.ac.uk/id/eprint/2243/1/Nwankwo%2C%20Damian%20%282022%29%20DBA%20Improving%20approaches%20to%20material%20inventory%20management.PDF"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Materials used in construction constitute a major proportion of the total cost of construction projects. An important factor of great concern that adversely affects construction projects is the location and tracking of materials, which normally come in bulk with minimal identification. There is inadequate integration of modern wireless technologies (such as Radio Frequency Identification (RFID), Personal Digital Assistant (PDA) or Just-in-Time (JIT)) into project management systems for easier and faster materials management and tracking and to overcome human error. This research focuses on improving approaches to material inventory management in the UK construction industry through the formulation of an RFID-based materials management tracking process system with projects. The existing literature review identified many challenges/problems in material inventory management on construction projects, such as supply delays, shortages, price fluctuations, wastage and damage, and insufficient storage space. Six construction projects were selected as exploratory case studies and cross-case analysis was used to investigate approaches to material inventory management practices: problems, implementation of ICT, and the potential for using emerging wireless technologies and systems (such as RFID and PDA) for materials tracking. Findings showed that there were similar problems of storage constraints and logistics with most of the construction projects. The synthesis of good practices required the implementation of RFID-facilitated construction management of materials tracking system to make material handling easier, quicker, more efficient and less paperwork. There was also a recommendation to implement Information and Communication Technology (ICT) tools to integrate plant, labour and materials into one system. The findings from the case studies and the literature review were used to formulate a process for real-time material tracking using Radio Frequency Identification (RFID) that can improve material inventory management in the UK construction industry. Testing and validation undertaken assisted in formulating a process that can be useful, functional and acceptable for a possible process system’s development. Finally, research achievements/contributions to knowledge, and limitations were discussed and some suggestions for further research were outlined."]},{"key":"dc:format","label":"Dc Format","values":["text"]},{"key":"dc:title","label":"Title","values":["Improving approaches to material inventory management in construction industry in the UK"]}]}],"canonical_facts":{"dc:contributor.sponsor":["University of Wales Trinity Saint David"],"dc:creator":["Nwankwo, Damian Chima"],"dc:date":["2023-01-28"],"dc:date.issued":["2023-01"],"dc:description.abstract":["Materials used in construction constitute a major proportion of the total cost of construction projects. An important factor of great concern that adversely affects construction projects is the location and tracking of materials, which normally come in bulk with minimal identification. There is inadequate integration of modern wireless technologies (such as Radio Frequency Identification (RFID), Personal Digital Assistant (PDA) or Just-in-Time (JIT)) into project management systems for easier and faster materials management and tracking and to overcome human error. This research focuses on improving approaches to material inventory management in the UK construction industry through the formulation of an RFID-based materials management tracking process system with projects. The existing literature review identified many challenges/problems in material inventory management on construction projects, such as supply delays, shortages, price fluctuations, wastage and damage, and insufficient storage space. Six construction projects were selected as exploratory case studies and cross-case analysis was used to investigate approaches to material inventory management practices: problems, implementation of ICT, and the potential for using emerging wireless technologies and systems (such as RFID and PDA) for materials tracking. Findings showed that there were similar problems of storage constraints and logistics with most of the construction projects. The synthesis of good practices required the implementation of RFID-facilitated construction management of materials tracking system to make material handling easier, quicker, more efficient and less paperwork. There was also a recommendation to implement Information and Communication Technology (ICT) tools to integrate plant, labour and materials into one system. The findings from the case studies and the literature review were used to formulate a process for real-time material tracking using Radio Frequency Identification (RFID) that can improve material inventory management in the UK construction industry. Testing and validation undertaken assisted in formulating a process that can be useful, functional and acceptable for a possible process system’s development. Finally, research achievements/contributions to knowledge, and limitations were discussed and some suggestions for further research were outlined."],"dc:format":["text"],"dc:identifier.doi":["10.82227/repository.uwtsd.ac.uk.00002243"],"dc:identifier.grantnumber":["UWTSD"],"dc:identifier.uri":["https://repository.uwtsd.ac.uk/id/eprint/2243/1/Nwankwo%2C%20Damian%20%282022%29%20DBA%20Improving%20approaches%20to%20material%20inventory%20management.PDF"],"dc:publisher.commercial":["University of Wales Trinity Saint David"],"dc:publisher.department":["Traethodau PhD","Institute of Management and Health: Business, Finance and Management"],"dc:publisher.institution":["University of Wales Trinity Saint David"],"dc:relation.isreferencedby":["https://repository.uwtsd.ac.uk/id/eprint/2243/"],"dc:subject":["AS Academïau a chymdeithasau dysgedig (Cyffredinol)","HE Cludiant a Chyfathrebiad","LB2361 Cwricwlwm","TA Peirianneg (Cyffredinol). Peirianneg Sifil (Cyffredinol)","TD Technoleg amgylcheddol. Peirianneg lanweithiol","TE Peirianneg briffyrdd. Ffyrdd a phalmentydd","TH Adeiladu adeiladau"],"dc:title":["Improving approaches to material inventory management in construction industry in the UK"],"dc:type":["Gosodiad"],"dc:type.qualificationlevel":["doctoral"],"dc:type.qualificationname":["dba"]},"updated_at":"2026-07-24T05:52:56Z"}