Back to results

Universiti Tun Hussein Onn Malaysia

A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system

Abstract

dc:description.abstract

The advancement of technology had encouraged mankind to design and create useful equipment and devices. These equipment enable users to fully utilize them in various applications. Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. Due to this, any malfunction of the equipment might cause mass losses to the company. In particular, the breakdown of the generator would cause other generators to be overloaded. In the meantime, the subsequence loads will be shed until the generators are sufficient to provide the power to other loads. Once the fault had been fixed, the load shedding scheme can be deactivated. Thus, load shedding scheme is the best way in handling such condition. Selected load will be shed under this scheme in order to protect the generators from being damaged. Multi Criteria Decision Making (MCDM) can be applied in determination of the load shedding scheme in the electric power system. In this thesis two methods which are Analytic Hierarchy Process (AHP) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) were introduced and applied. From this thesis, a series of analyses are conducted and the results are determined. Among these two methods which are AHP and TOPSIS, the results shown that TOPSIS is the best Multi criteria Decision Making (MCDM) for load shedding scheme in the pulp mill system. TOPSIS is the most effective solution because of the highest percentage effectiveness of load shedding between these two methods. The results of the AHP and TOPSIS analysis to the pulp mill system are very promising.

Degree

thesis:*
Name dc:type.qualificationname
mphil
Level dc:type.qualificationlevel
masters
Grantor dc:publisher.institution
Universiti Tun Hussein Onn Malaysia
Year dc:date.issued
2014

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Ibrahim, Zarina

Subjects

dc:subject × 2

Rights

Language dc:language
en

Chain of custody

source
Harvested from
Universiti Tun Hussein Onn Malaysia
Base URL
eprints.uthm.edu.my/cgi/oai2
Last updated
2026-07-24
Source record
OAI-PMH GetRecord
citation

Ibrahim, Zarina. A comparative study of the AHP and TOPSIS methods for implementing load shedding scheme in a pulp mill system. masters thesis, Universiti Tun Hussein Onn Malaysia, 2014.